A technical workshop on the 2009 National Electric Transmission Congestion Study was held on March 25-26, 2009 to receive input from subject matter experts on the historical transmission data and studies of future transmission projections in the Western and Eastern Interconnections.

Session 2: Historic Congestion in the Eastern Interconnection