You are here

EIS-0478: Notice of Intent and Notice of Floodplains and Wetland Action

Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billings, Williams, McKenzie, and Mountrail Counties, North Dakota

The Rural Utilities Service (RUS), an agency within the U.S. Department of Agriculture (USDA), intends to prepare an environmental impact statement (EIS) for Basin Electric Power Cooperative’s  (Basin Electric) proposed Antelope Valley Station (AVS) to Neset Transmission Project (Project) in North Dakota. 

The EIS will address the construction, operation, and maintenance of Basin Electric’s proposed Project. The Project includes construction, operation and maintenance of approximately 190 miles of new 345-kV single pole transmission line and double circuit 345/115-kV transmission lines, 2 new substations, modifications to 4 existing substations, a 345-kV switchyard, maintenance access roads, temporary construction roads, river crossings, temporary construction staging sites, and other facilities to be described in the proposed EIS. Basin Electric’s proposed Project would be located in portions of Billings, Dunn, McKenzie, Mercer, Mountrail, and Williams counties in western North Dakota. 

Portions of Basin Electric’s proposed Project may affect floodplains and wetlands. This NOI also serves as a notice of proposed floodplain or wetland action.