EIS-0285-SA-84: Supplement Analysis

Transmission System Vegetation Management Program

Vegetation Management along the Monroe–Custer No. 1500kV transmission line from structure 61/1 through structure 88/4. This project includes contemporaneous vegetation management along the Monroe-Custer No. 2 500kV and the Arlington-Bellingham 230kV transmission line corridors which run parallel to the subject transmission line. Corridor width varies from 140 to 825 feet. (All structure locations referenced in this SA refer to the Monroe-Custer No. 1.) The project area is located within Whatcom County, Washington