You are here

EIS-025-SA-106: Supplement Analysis

Transmission System Vegetation Management Program -106 SnoKing Tap to Monroe-Samamish Line) within Snohomish County, Washington

Vegetation Management along the SnoKing Tap to the Monroe-Samamish transmission line from structure 8/1 through structure 20/6. BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 12 miles of access roads will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 65 tower sites will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Vegetation management is required for unimpeded operation and maintenance of the subject transmission line. See Section 1of the attached checklist for a complete description of the proposal.