Electrical Interconnection of the Leaning Juniper II Wind Project

The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of up to 200 megawatts (MW) of power to be generated by the proposed Leaning Juniper II Wind Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Iberdrola Renewables, Inc. (Iberdrola) proposes to construct and operate the proposed Wind Project in Gilliam County, Oregon, and has requested interconnection to the FCRTS at BPA’s Jones Canyon Substation in Gilliam County, Oregon. BPA will expand this existing substation and install new equipment at the substation to accommodate this additional power into the FCRTS.