Electrical Interconnection of the Goodnoe Hills and White Creek Wind Energy Projects

The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 350 megawatts (MW) of power to be generated by the proposed Goodnoe Hills (150 MW) and White Creek (200 MW) Wind Energy Projects (Wind Projects) into the Federal Columbia River Transmission System (FCRTS). The Wind Projects will be interconnected at the proposed BPA Rock Creek substation. This substation will be constructed as a 500/230-kilovolt (kV) substation along BPA’s Wautoma - John Day No.1 500-kV transmission line. These proposed facilities will be located in Klickitat County, Washington.