You are here

CX-011222: Categorical Exclusion Determination

Siting, Construction, and Operation of New Septic Tank, Drain Field and Fencing at the 400 Area Fast Flux Test Facility
CX(s) Applied: B1.15
Date: 10/28/2013
Location(s): Washington
Offices(s): River Protection-Richland Operations Office

CH2MHill Plateau Remediation Company (PRC) will be conducting siting, construction, and operation of a new septic tank, drain field and fending at the 400 Area Fast Flux Test Facility.