You are here

CX-010913: Categorical Exclusion Determination

Replace B920 Fire Wall Line: Phase Two
CX(s) Applied: B1.3
Date: 09/24/2013
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory

Replace the 8-inch fire water lines and isolation valves to the west of B-920. Roadways which are disturbed due to water line installation are to be repaved.