CX-010541: Categorical Exclusion Determination

Optimization Project Area #2
CX(s) Applied: B2.5, B5.2, B5.4, B5.5
Date: 06/28/2013
Location(s): Wyoming
Offices(s): RMOTC

The purpose of this project is to replace corroded steel lines from 35 wells with a 2-inch polypipe, bring the wells back on production, route the production from 24 of them into T-3-34 Test Manifold I, and install a line from T-3-34 Test Manifold to T-2-34 Production Manifold for shipment, picking up 11 additional wells.