CX-009528: Categorical Exclusion Determination

WVDP-2012-01 WVDP Reservoir Interconnecting Canal Maintenance Activities
CX(s) Applied: B1.3
Date: 08/02/2012
Location(s): New York
Offices(s): West Valley Demonstration Project

The purpose of this project is to mitigate impedance of design flow and drainage between the two West Valley Demonstration Project water supply reservoirs. Sedimentation and bank sloughing has resulted in filling of the reservoir interconnecting canal impeding design water flow within the system.