You are here

CX-007813: Categorical Exclusion Determination

Bayou Choctaw Building 401 Air Handling Unit-3 Heating, Ventilation and Air Conditioning Replacement
CX(s) Applied: B1.4
Date: 02/01/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office

Subcontractor shall provide all labor, tools, materials, equipment and supervision required to replace the Bayou Choctaw Building 401 Air Handling Unit (AHU-3) and its associated air cooled condensing unit at the Bayou Choctaw Strategic Petroleum Reserve site for the existing Heating, Ventilation, and Air Conditioning (HVAC) unit.