CX-007126: Categorical Exclusion Determination

Basic Substation Phase 2 Soil Remediation
CX(s) Applied: B6.1
Date: 03/10/2011
Location(s): Henderson, Nevada
Office(s): Western Area Power Administration-Desert Southwest Region

Western proposes to excavate polychlorinated biphenyl and total petroleum hydrocarbon-contaminated soils within the Basic Substation yards 1, 2 and 3 as well as the T9 and T10 areas as well as remove asbestos wrapped pipe and conduit. Western will also be removing creosote-contaminated railroad ties. We will use existing access roads and vehicles such as pickup trucks, crew trucks, backhoes and dump trucks. This work is necessary to maintain sanitary and safe working conditions.