Tribal Energy Program. The Yakama Nation Hydropower proposed project is for purchasing and installing a water turbine for Drop Site #4, located near Harrah, Washington, that would supplement the power generation for the Wapato Irrigation Project (WIP). Upon completion, Yakama Power would operate the hydroelectric project. Since Phase I of the proposed project is primarily for preliminary project assessments, permitting activities, environmental reviews, scoping meetings, preparation of the National Environmental Policy Act (NEPA) document, and pre-construction studies, the Department of Energy has determined that this phase of the project can be categorically excluded. The Bureau of Indian Affairs-Yakama Agency will serve as the lead agency for NEPA purposes.