New A-Area Firewater Pumphouse
CX(s) Applied: B1.15
Date: 05/11/2009
Location(s): Aiken, South Carolina
Office(s): Environmental Management, Savannah River Operations Office


A 300,000-gallon firewater tank and an electric driven firewater pump and a diesel driven firewater pump are to be installed between the 713-A and 713-1A pads. Existing firewater pumps at 784-A are to be removed before the 784-A powerhouse is demolished (not by this project).

DOCUMENT(S) AVAILABLE FOR DOWNLOAD