  • September 11, 2014

    Henderson-Mead Number 2 230-Kilovolt Transmission Line, Erosion Repair at Structure 2/4
    CX(s) Applied: B1.3
    Date: 09/11/2013
    Location(s): Nevada, Nevada
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • April 17, 2014

    Wood Pole Testing for 20 Transmission Lines in Southern Arizona and Southern California
    CX(s) Applied: B3.1
    Date: 04/17/2014
    Location(s): Arizona, Arizona, Arizona, California, California
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • April 17, 2014

    Wood Pole Testing for 20 Transmission Lines in Southern Arizona and Southern California
    CX(s) Applied: B3.1
    Date: 04/17/2014
    Location(s): Arizona, Arizona, Arizona, California, California
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • April 1, 2014

    Emergency Installation of Concrete Pad for Western's Communication Tower at Valley Farms Substation
    CX(s) Applied: B4.6
    Date: 04/01/2014
    Location(s): Arizona, Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • April 1, 2014

    Liberty Substation - Vegetation Management
    CX(s) Applied: B1.3
    Date: 04/01/2014
    Location(s): Arizona, Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • February 18, 2014

    Outgrant to Southwest Gas for an Underground Natural Gas Distribution Pipeline at Coolidge Substation
    CX(s) Applied: B1.24
    Date: 02/18/2014
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • February 6, 2014

    Glen Canyon Substation 345 Kilovolt - Sulfur Hexafluoride and Concrete Pad Installation
    CX(s) Applied: B4.6
    Date: 02/06/2014
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • February 5, 2014

    Henderson 230 Kilovolt Switchyard (Erosion Control)
    CX(s) Applied: B1.3
    Date: 02/06/2014
    Location(s): Nevada
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • January 23, 2014

    Substation Maintenance and Renovation Activities for 2014
    CX(s) Applied: B1.3
    Date: 01/23/2014
    Location(s): Arizona, California, Nevada
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • January 21, 2014

    Blythe-Knob 161 Kilovolt Transmission Line, Structure Maintenance Project
    CX(s) Applied: B1.3
    Date: 01/21/2014
    Location(s): California, California
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • January 13, 2014

    Cable Trenching in the Gila Substation
    CX(s) Applied: B4.6
    Date: 01/13/2014
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • January 9, 2014

    Electrical District 2 to Saguaro #2 115 Kilovolt Transmission Line, Marker Ball Installation at Structure 26-10.
    CX(s) Applied: B1.3
    Date: 01/09/2014
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • December 18, 2013

    Parker-Gila 161 Kilovolt Transmission Line - Structure 109-8 Relocation
    CX(s) Applied: B1.3
    Date: 12/18/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • December 17, 2013

    Davis-Parker 230 Kilovolt Transmission Line- Marker Ball(s) Replacement
    CX(s) Applied: B1.3
    Date: 12/17/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • December 16, 2013

    Hot Crossarm Changeout Training at 6 Structures
    CX(s) Applied: B1.3
    Date: 12/16/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • December 3, 2013

    Saguaro-Tucson 115 Kilovolt Transmission Line Structure Replacement
    CX(s) Applied: B1.3
    Date: 12/03/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • November 22, 2013

    Hazard Tree Removal Along the Prescott Peacock 230 Kilovolt Transmission Line
    CX(s) Applied: B1.3
    Date: 11/22/2013
    Location(s): Arizona, Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • November 8, 2013

    Protection and Communication Facilities Maintenance
    CX(s) Applied: B1.3, B1.7, B1.19
    Date: 11/08/2013
    Location(s): Arizona, Nevada, California, Utah
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • October 30, 2013

    Oracle Substation - Breaker Support Work
    CX(s) Applied: B1.3
    Date: 10/30/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • October 25, 2013

    Structure 112-4 LIBPAD1 230-kilovolt Transmission Line "Live Line" Maintenance Training
    CX(s) Applied: B1.2
    Date: 10/25/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • October 8, 2013

    Bi-Annual "Live Line" Maintenance Training
    CX(s) Applied: B1.2
    Date: 10/08/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • September 23, 2013

    COLORA - Cross-Arm Replacement, Structure Numbers 12-3, 12-6
    CX(s) Applied: B1.3
    Date: 09/23/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • September 6, 2013

    Tucson-Apache 115-Kilovolt Transmission Line Structure Stabilization Project
    CX(s) Applied: B1.3
    Date: 09/06/2013
    Location(s): Arizona, Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • September 1, 2013

    Adams Tap Motor-Operator Interrupters and Control Building Replacement
    CX(s) Applied: B4.6
    Date: 09/11/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • August 26, 2013

    Emergency Storm Damage Repairs to the Gila North Gila, Gila Knob, and Sonora San Luis Transmission Lines, near Yuma, Yuma County, Arizona
    CX(s) Applied: B4.6
    Date: 08/26/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region