Location

Categorical Exclusion Determinations issued for actions in Washington.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • May 26, 2016

    Hydro Research Foundation University Research Awards
    Award Number: DE-EE0006506
    CX(s) Applied: A9
    Water Power Program
    Date: 05/19/2016
    Location(s): WA
    Office(s): Golden Field Office

  • May 19, 2016

    Marine Mammal Behavioral Response to Tidal Turbine Sound
    Award Number: DE-EE0006385
    CX(s) Applied: A11, B3.3,
    Water Power Program
    Date: 05/12/2016
    Location(s): WA
    Office(s): Golden Field Office

  • March 18, 2016

    Reduction of System Cost Characteristics Through Innovative Solutions to Installation, Operations, and Maintenance
    Award Number: DE-EE0007347
    CX(s) Applied: A9
    Water Power Program br> Date: 03/18/2016
    Location(s): WA
    Office(s): Golden Field Office

  • March 11, 2016

    Survivability Enhancement of a Multi-Mode Point Absorber
    Award Number: DE-EE0007346
    CX(s) Applied: A9, B3.6
    Water Power Program
    Date: 03/10/2016
    Location(s): WA
    Office(s): Golden Field Office

  • March 4, 2016

    Geothermal Play-Fairway Analysis of Washington State Properties
    Award Number: DE-EE0006728
    CX(s) Applied: A9, B3.1
    Geothermal Technologies Office
    Date: 03/04/2016
    Location(s): WA
    Office(s): Golden Field Office

  • February 23, 2016

    Energy OutWest Peer Exchange
    Award Number: DE-EE0006298
    CX(s) Applied: A9, A11
    Weatherization & Intergovernmental Programs
    Date: 02/21/2014
    Location(s): WA
    Office(s): Golden Field Office

  • January 12, 2016

    Optimized Composite Prototype for Archimedes Turbine Manufacture
    Award Number: DE-EE0007427
    CX(s) Applied: A9, B3.6
    Water Power Technologies Office
    Date: 01/12/2016
    Location(s): IN
    Office(s): Golden Field Office

  • August 26, 2015

    Taneum Creek Property Acquisition Funding
    CX(s) Applied: B1.25
    Date: 08/26/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • August 24, 2015

    Kennewick Radio Station HVAC Replacement
    CX(s) Applied: B1.4
    Date: 08/24/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • August 7, 2015

    Low-Cost, Efficient, and Durable High Temperature Wireless Sensors by Direct Write Additive Manufacturing for Application in Fossil Energy Systems
    CX(s) Applied: B3.6
    Date: 08/07/2015
    Location(s): Washington
    Offices(s): National Energy Technology Laboratory

  • August 6, 2015

    Approval of Land Use Review Request for Fiber Installation in BPA right-of-way in Skamania County, Washington
    CX(s) Applied: B4.9
    Date: 08/06/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • July 30, 2015

    North Bonneville-Ross Transmission Line Right-of-way Sale and Temporary Construction Permit - New Four Seasons Lane to 138th Ave. Segment
    CX(s) Applied: B1.24
    Date: 07/30/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • July 24, 2015

    Small-scale Renewable Energy Research and Development and Pilot Projects
    CX(s) Applied: B5.15
    Date: 07/24/2015
    Location(s): Washington
    Offices(s): Pacific Northwest Site Office

  • July 23, 2015

    Ellensburg Substation Expansion and Control House Addition
    CX(s) Applied: B4.11
    Date: 07/23/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • July 22, 2015

    Chehalis-Mayfield No. 1 Line Local Area Protection Scheme Project
    CX(s) Applied: B1.7, B2.2
    Date: 07/22/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • July 21, 2015

    Badger Canyon Substation Upgrades
    CX(s) Applied: B4.6
    Date: 07/21/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • July 21, 2015

    Ross-Lexington 12/2 Tower Stabilization Project
    CX(s) Applied: B1.3
    Date: 07/21/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • July 16, 2015

    Modified Thermoresponsive Hyperbranched Polymers for Improved Viscosity and Enhanced Lubricity of Engine Oils
    CX(s) Applied: A9
    Date: 07/16/2015
    Location(s): Washington
    Offices(s): National Energy Technology Laboratory

  • July 9, 2015

    Acquisition of Multiple Access Road Easements for the Holcomb-Naselle No. 1 Transmission Line
    CX(s) Applied: B1.42
    Date: 07/09/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • July 8, 2015

    Washougal Vegetative Maintenance - LURR 20150160
    CX(s) Applied: B4.9
    Date: 07/08/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • July 2, 2015

    Longview Osmose 2015 Corrosion Mitigation and Repair Project
    CX(s) Applied: B1.3
    Date: 07/02/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • June 30, 2015

    Puget Sound Energy Fiber Connection
    CX(s) Applied: B1.42
    Date: 06/30/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • June 25, 2015

    Ross Complex Sally Port Entrance Relocation
    CX(s) Applied: B4.7
    Date: 06/25/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • June 24, 2015

    Aberdeen Substation (Grays Harbor PUD) Tree Clearing
    CX(s) Applied: B1.32
    Date: 06/24/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • June 24, 2015

    St. Johns-St. Helens Transmission Line Access Road Improvements
    CX(s) Applied: B1.3
    Date: 06/24/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration