  • April 24, 2014

    Raver-Covington Conductor Replacement
    CX(s) Applied: B1.3
    Date: 04/24/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • April 23, 2014

    Yakima Training Center Wind Resource Assessment
    CX(s) Applied: A9, B3.1
    Date: 04/23/2014
    Location(s): Washington
    Offices(s): Golden Field Office

  • April 21, 2014

    Burial of Overhead Fiber Optic Cable at Grand Coulee Radio Station
    CX(s) Applied: B4.7
    Date: 04/21/2014
    Location(s): Washington, Washington
    Offices(s): Bonneville Power Administration

  • April 21, 2014

    Cowlitz Falls Fish Facility and Fish Transfer Facility Property Transfers
    CX(s) Applied: B1.24
    Date: 04/21/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • April 16, 2014

    Capability Enhancement at the 325 Hazardous Waste Treatment Units
    CX(s) Applied: B6.6
    Date: 04/16/2014
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • April 14, 2014

    Tacoma-Raver Access Road Easement Exchange
    CX(s) Applied: B1.24
    Date: 04/14/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • April 11, 2014

    Line Tap Construction on the East Ellensburg Tap to Columbia-Ellensburg Transmission Line
    CX(s) Applied: B4.6
    Date: 04/11/2014
    Location(s): Washington, Washington
    Offices(s): Bonneville Power Administration

  • April 3, 2014

    Chehalis-Mayfield Number 1 Line Impairment Structure Replacements
    CX(s) Applied: B1.3
    Date: 04/03/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • April 2, 2014

    B3S4-White Bluffs Number 1 and Benton-B3S4 Number 1 Transmission Line Reroute
    CX(s) Applied: B4.13
    Date: 04/02/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • April 2, 2014

    Cowlitz Falls Fish Facility Access Agreement Extension
    CX(s) Applied: A2
    Date: 04/02/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • April 1, 2014

    Port Townsend Paper Corporation Power Sales Agreement Amendment
    CX(s) Applied: B4.1
    Date: 04/01/2014
    Location(s): Oregon, Washington
    Offices(s): Bonneville Power Administration

  • March 17, 2014

    Telephone Line Removal Along the Access Road into Wautoma Substation
    CX(s) Applied: B1.3
    Date: 03/17/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • January 27, 2014

    Fiber Installation at Snohomish, SnoKing and Murray Substations
    CX(s) Applied: B4.7
    Date: 01/27/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • January 22, 2014

    St. Clair Loop in to Olympia-South Tacoma No.1 230-kilovolt (kV) Transmission Line
    CX(s) Applied: B4.11
    Date: 01/22/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • January 22, 2014

    Ellensburg-Moxee No. 1 Right-Of-Way (ROW) Geotechnical Exploration Between Structures 17/1-22/2
    CX(s) Applied: B4.7
    Date: 01/22/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • January 17, 2014

    Franklin to Hatwai Fiber Project
    CX(s) Applied: B4.7
    Date: 01/17/2014
    Location(s): Washington, Washington, Washington, Idaho
    Offices(s): Bonneville Power Administration

  • January 15, 2014

    Ross Communication Tower Fiber Installation
    CX(s) Applied: B4.7
    Date: 01/15/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • January 6, 2014

    Longview-Cowlitz Fiber Optic Cable Upgrade
    CX(s) Applied: B4.7
    Date: 01/06/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • December 30, 2013

    Revenue Meter Installation at Wind River Biomass Facility
    CX(s) Applied: B1.7
    Date: 12/30/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • December 26, 2013

    Equipment and Property Transfers with Three Public Utilities in Oregon, Idaho and Washington
    CX(s) Applied: B1.124
    Date: 12/26/2013
    Location(s): Oregon, Idaho, Washington
    Offices(s): Bonneville Power Administration

  • December 19, 2013

    Arzeda Corp. - Design of Metalloenzymes for Methane Activation
    CX(s) Applied: B3.6
    Date: 12/19/2013
    Location(s): Washington
    Offices(s): Advanced Research Projects Agency-Energy

  • December 18, 2013

    Crooked Creek 3 and Deep River Mouth 2 Property Funding
    CX(s) Applied: B1.25
    Date: 12/18/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • December 17, 2013

    Pacific Northwest National Laboratory - Catalyzed Organo-Metathetical Process for Magnesium Production from Seawater
    CX(s) Applied: B3.6
    Date: 12/17/2013
    Location(s): Washington, Arizona, Utah
    Offices(s): Advanced Research Projects Agency-Energy

  • December 11, 2013

    Xeriscaping at Four Facilities
    CX(s) Applied: B1.3
    Date: 12/11/2013
    Location(s): Oregon, Oregon, Washington, Montana
    Offices(s): Bonneville Power Administration

  • December 6, 2013

    Regents of the University of Michigan - Anaerobic Bioconversion of Methane to Methanol
    CX(s) Applied: B3.6
    Date: 12/06/2013
    Location(s): Michigan, Washington, Washington
    Offices(s): Advanced Research Projects Agency-Energy