You are here

Categorical Exclusion Determinations: Strategic Petroleum Reserve Field Office

Categorical Exclusion Determinations issued by Strategic Petroleum Reserve Field Office.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • May 27, 2014

    Purchase of West Hackberry Gate Valve Replacement Parts
    CX(s) Applied: B1.3
    Date: 05/27/2014
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • May 19, 2014

    Site Wide Card Access System Hardware and Software Upgrade
    CX(s) Applied: B1.7
    Date: 05/19/2014
    Location(s): Texas, Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • April 24, 2014

    Rework West Hackberry 36” Crude Oil Pipeline Mainline Valves
    CX(s) Applied: B1.3
    Date: 12/10/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • March 13, 2014

    Big Hill Anhydrite Pond Sampling and Analysis
    CX(s) Applied: B3.1
    Date: 09/23/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • February 14, 2014

    Bryan Mound Upgrade Wood to Steel Light Poles
    CX(s) Applied: B1.3
    Date: 02/14/2014
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 30, 2014

    Double Outriggers for Bayou Choctaw North Fence
    CX(s) Applied: B1.11
    Date: 01/30/2014
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 27, 2014

    Replace Bayou Choctaw 16” B-Spec Crude Oil Header Piping
    CX(s) Applied: B1.3
    Date: 01/27/2014
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 10, 2014

    Strategic Petroleum Reserve Leased Workover Rig and Workover Services, 2014-2018
    CX(s) Applied: B5.12
    Date: 01/10/2014
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 10, 2014

    Bayou Choctaw Cavern 20 Decommissioning (Long Term Actions)
    CX(s) Applied: B1.28
    Date: 01/10/2014
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • December 17, 2013

    Bryan Mound Substation Upgrade to 138 Kilovolts
    CX(s) Applied: B1.3
    Date: 12/17/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • December 10, 2013

    Demolish State Police Radio Tower at West Hackberry
    CX(s) Applied: B1.19
    Date: 12/10/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • October 31, 2013

    Replacement of Big Hill TX-14 Transformer, Government Furnished Equipment
    CX(s) Applied: B1.3
    Date: 10/31/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • October 28, 2013

    Bryan Mound Brine Disposal Pump Replacement (Install)
    CX(s) Applied: B5.2
    Date: 10/28/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • October 15, 2013

    West Hackberry RWIS Recycle Valve Upgrade
    CX(s) Applied: B1.3
    Date: 10/15/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • October 1, 2013

    Replacement of Deep-Anode Ground Bed Sites for Big Hill Cavern 104 and Site Unit 1 “A”, and BC Cavern 18
    CX(s) Applied: B1.3
    Date: 10/01/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • September 17, 2013

    Replace Obsolete West Hackberry Raw Water Injection Pump Vibration Transmitters Government Furnished Equipment
    CX(s) Applied: B5.2
    Date: 09/17/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • September 9, 2013

    Blast and Paint West Hackberry Meter Skid, Prover Piping and Structure
    CX(s) Applied: B1.3
    Date: 09/09/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 22, 2013

    Smart and Calibrated Pig Surveys of Strategic Petroleum Reserve Raw Water/Crude Oil Pipelines
    CX(s) Applied: B1.3
    Date: 08/22/2013
    Location(s): Texas, Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 19, 2013

    Clean and Inspect West Hackberry T-15 Brine Tank
    CX(s) Applied: B1.3
    Date: 08/19/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 8, 2013

    Replace Big Hill Circuit Breakers OCB-4009, 4010, and 4011 (install)
    CX(s) Applied: B1.3
    Date: 08/08/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • July 11, 2013

    Strategic Petroleum Reserve Computer Services, 2015-2020
    CX(s) Applied: B1.7
    Date: 07/11/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • July 9, 2013

    Replace Bayou Choctaw 500 KVA Power Transformer
    CX(s) Applied: B1.3
    Date: 07/09/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • July 3, 2013

    Replace West Hackberry Brine Disposal System Header from MOV-51’s to WHT-14/15 Brine Tanks with HDPE Pipe
    CX(s) Applied: B5.2
    Date: 07/03/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • July 3, 2013

    Bryan Mound Brine Disposal Pump Replacement
    CX(s) Applied: B5.2
    Date: 07/03/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • June 28, 2013

    Replace Big Hill Circuit Breakers OCB-4009, 4010 and 4011
    CX(s) Applied: B1.33
    Date: 06/28/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office