  • September 3, 2014

    BHP-3 Offsite Bump Repair
    CX(s) Applied: B1.3
    Date: 41885
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • September 2, 2014

    Replace Windows of Bryan Mound Portal Building #281
    CX(s) Applied: B1.3
    Date: 41884
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 29, 2014

    Replace West Hackberry Radio Tower
    CX(s) Applied: B1.19
    Date: 41880
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 29, 2014

    Hydrogen Sulfide Scavenger BOA (Multiple)
    CX(s) Applied: B5.2
    Date: 41880
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 27, 2014

    Convert BMT-2 to External Floating Roof Tank
    CX(s) Applied: B1.3
    Date: 41878
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 18, 2014

    Direct Assessment and Repair of BH-SUN 36-inch Crude Oil Pipeline
    CX(s) Applied: B5.4
    Date: 41869
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • June 30, 2014

    Install Single Split System Air Conditioning Unit in Bryan Mound Building No. 281 (BM-OM-1229)
    CX(s) Applied: B1.4
    Date: 06/30/2014
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • June 24, 2014

    Offsite Inspection and Repair of DOE Workover Rig #155 (PR 10090916)
    CX(s) Applied: B1.3
    Date: 06/24/2014
    Location(s): CX: none
    Offices(s): Strategic Petroleum Reserve Field Office

  • June 11, 2014

    Maintain/Repair SPR Radio Communications Network, 2014-2017
    CX(s) Applied: B1.7
    Date: 06/11/2014
    Location(s): CX: none
    Offices(s): Strategic Petroleum Reserve Field Office

  • June 9, 2014

    Replace West Hackberry Ported Coax at Northwest Perimeter (WH-OM-1194)
    CX(s) Applied: B1.7
    Date: 06/09/2014
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • May 27, 2014

    Purchase of West Hackberry Gate Valve Replacement Parts
    CX(s) Applied: B1.3
    Date: 05/27/2014
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • May 19, 2014

    Site Wide Card Access System Hardware and Software Upgrade
    CX(s) Applied: B1.7
    Date: 05/19/2014
    Location(s): Texas, Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • April 24, 2014

    Rework West Hackberry 36” Crude Oil Pipeline Mainline Valves
    CX(s) Applied: B1.3
    Date: 12/10/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • March 13, 2014

    Big Hill Anhydrite Pond Sampling and Analysis
    CX(s) Applied: B3.1
    Date: 09/23/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • February 14, 2014

    Bryan Mound Upgrade Wood to Steel Light Poles
    CX(s) Applied: B1.3
    Date: 02/14/2014
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 30, 2014

    Double Outriggers for Bayou Choctaw North Fence
    CX(s) Applied: B1.11
    Date: 01/30/2014
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 27, 2014

    Replace Bayou Choctaw 16” B-Spec Crude Oil Header Piping
    CX(s) Applied: B1.3
    Date: 01/27/2014
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 10, 2014

    Strategic Petroleum Reserve Leased Workover Rig and Workover Services, 2014-2018
    CX(s) Applied: B5.12
    Date: 01/10/2014
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 10, 2014

    Bayou Choctaw Cavern 20 Decommissioning (Long Term Actions)
    CX(s) Applied: B1.28
    Date: 01/10/2014
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • December 17, 2013

    Bryan Mound Substation Upgrade to 138 Kilovolts
    CX(s) Applied: B1.3
    Date: 12/17/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • December 10, 2013

    Demolish State Police Radio Tower at West Hackberry
    CX(s) Applied: B1.19
    Date: 12/10/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • October 31, 2013

    Replacement of Big Hill TX-14 Transformer, Government Furnished Equipment
    CX(s) Applied: B1.3
    Date: 10/31/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • October 28, 2013

    Bryan Mound Brine Disposal Pump Replacement (Install)
    CX(s) Applied: B5.2
    Date: 10/28/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • October 15, 2013

    West Hackberry RWIS Recycle Valve Upgrade
    CX(s) Applied: B1.3
    Date: 10/15/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • October 1, 2013

    Replacement of Deep-Anode Ground Bed Sites for Big Hill Cavern 104 and Site Unit 1 “A”, and BC Cavern 18
    CX(s) Applied: B1.3
    Date: 10/01/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office