  • April 29, 2014

    Keeler and Troutdale Substations Communication Equipment Additions
    CX(s) Applied: B1.7
    Date: 12/30/2013
    Location(s): Oregon, Oregon
    Offices(s): Bonneville Power Administration

  • April 28, 2014

    2014 Alvey District Wood Pole Replacement Projects
    CX(s) Applied: B1.3
    Date: 04/28/2014
    Location(s): Oregon, Oregon, Oregon
    Offices(s): Bonneville Power Administration

  • April 28, 2014

    2014 Chemawa District Wood Pole Replacement Projects
    CX(s) Applied: B1.3
    Date: 04/28/2014
    Location(s): Oregon, Oregon, Oregon, Oregon, Oregon
    Offices(s): Bonneville Power Administration

  • April 28, 2014

    High Pressure Immersion and Reactive Transport Laboratory
    CX(s) Applied: B3.6
    Date: 04/28/2014
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • April 25, 2014

    John Day Powerhouse-John Day Number 1-4 Conductor Replacements
    CX(s) Applied: B1.3
    Date: 04/25/2014
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • April 24, 2014

    Meter Installation at Fossil Lake Solar Project
    CX(s) Applied: B1.7
    Date: 04/24/2014
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • April 21, 2014

    High Temperature Laboratory
    CX(s) Applied: B3.6
    Date: 04/21/2014
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • April 10, 2014

    Hat Rock Tap Switching Station Equipment Transfer
    CX(s) Applied: B1.24
    Date: 04/10/2014
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • April 7, 2014

    Marion-Alvey Marion-Lane Insulator Replacement Project
    CX(s) Applied: B1.3
    Date: 04/07/2014
    Location(s): Oregon, Oregon
    Offices(s): Bonneville Power Administration

  • April 2, 2014

    Building 4 FSARS
    CX(s) Applied: B1.3
    Date: 04/02/2014
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • February 19, 2014

    Analytical Physics - Scanning Electron Microscope
    CX(s) Applied: B3.6
    Date: 02/19/2014
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • February 6, 2014

    Malin Substation Storm Drain and Switchyard Rock Improvements
    CX(s) Applied: B1.3
    Date: 02/06/2014
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • January 30, 2014

    Analytical Physics - Transmission Electron Microscopy (TEM)
    CX(s) Applied: B3.6
    Date: 01/30/2014
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • January 30, 2014

    Analytical Physics - Thermal Analysis
    CX(s) Applied: B3.6
    Date: 01/30/2014
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • January 29, 2014

    McNary Substation Equipment Acquisition
    CX(s) Applied: B1.24
    Date: 01/29/2014
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • January 28, 2014

    Building 26 FSARS
    CX(s) Applied: B1.3, Facility operation and maintenance
    Date: 01/28/2014
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • January 15, 2014

    Lightspeed Network's Fiber Installation near Pilot Butte Substation
    CX(s) Applied: B4.7
    Date: 01/15/2014
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • January 15, 2014

    The Pacific Marine Energy South Energy Test Site (PMEC-SETS)
    CX(s) Applied: A9
    Date: 01/15/2014
    Location(s): Oregon
    Offices(s): Golden Field Office

  • December 26, 2013

    Equipment and Property Transfers with Three Public Utilities in Oregon, Idaho and Washington
    CX(s) Applied: B1.124
    Date: 12/26/2013
    Location(s): Oregon, Idaho, Washington
    Offices(s): Bonneville Power Administration

  • December 18, 2013

    Using Multiple In Situ Approaches to Assess Fish Communities and their Connectivity in the Vicinity of Natural Rocky Outcrops and an Adjacent Active Wave Energy Conversion Site in the Pacific Northwest
    CX(s) Applied: A9, B3.3
    Date: 12/18/2013
    Location(s): Oregon, Oregon
    Offices(s): Golden Field Office

  • December 17, 2013

    Measuring Changes in Ambient Noise Levels from the Installation and Operation of a Wave Energy Converter in the Coastal Ocean
    CX(s) Applied: B3.3
    Date: 12/17/2013
    Location(s): Oregon
    Offices(s): Golden Field Office

  • December 16, 2013

    Build and Test of a Novel, Commercial-Scale Wave Energy Direct0Drive Rotary Power Take-Off Under Realistic Open-Ocean Conditions
    CX(s) Applied: A9, B5.15
    Date: 12/16/2013
    Location(s): Oregon, Virginia, Colorado
    Offices(s): Golden Field Office

  • December 11, 2013

    Organic Speciation and Interactions in Actinide-Lanthanide Separation (ALSEP) – One Step Partitioning Process of Minor Actinides, Lanthanides, and Fission Products
    CX(s) Applied: B3.6
    Date: 12/11/2013
    Location(s): Oregon
    Offices(s): Idaho Operations Office

  • December 11, 2013

    Xeriscaping at Four Facilities
    CX(s) Applied: B1.3
    Date: 12/11/2013
    Location(s): Oregon, Oregon, Washington, Montana
    Offices(s): Bonneville Power Administration

  • November 29, 2013

    Fence Replacement on the Latham Tap Transmission Line Corridor
    CX(s) Applied: B1.3
    Date: 11/29/2013
    Location(s): Oregon
    Offices(s): Bonneville Power Administration