April 22, 2024

CX-270719: Kesselring Site S8G-P Structural Steel Refurbishment Project

S8G prototype has been in service for over 30 years, its structural steel support systems require refurbishment and replacement.

February 21, 2024

CX-029886: Champlain Hudson Power Express Project: Presidential Permit Amendment PP-481-3

On October 6, 2014, DOE issued Presidential Permit No. PP-362, authorizing Champlain Hudson Power Express, Inc. (CHPEI) to construct, operate, main…

February 7, 2024

CX-029993: Hydrogen Loss Quantification Technology Enabled by Networked Dielectric Excitation Gas Sensors

The U.S. Department of Energy (DOE) is proposing to provide funding to General Electric for the development, strengthening, and field testing of a …

February 7, 2024

CX-029992: Composite LH2 Tank for Heavy Duty Trucks and H2 Aircraft

The U.S. Department of Energy (DOE) is proposing to provide federal funding to GE Research (GE) to design, manufacture, and test a composite liquid…

January 16, 2024

CX-029655: Produced Water Consortium for Ultralight Composite Manufactured by Accelerated

Laboratory testing to develop a prototype with the ability to separate freshwater from concentrated produced water, lab testing of building panels,…

January 11, 2024

CX-029940: High-Voltage DC MULTI-terminal SIMulation - HVDC MULTI SIM

The U.S. Department of Energy (DOE) is proposing to provide funding to General Electric (GE) Research to develop a High-Voltage Direct Current (HVD…

January 10, 2024

CX-029936: Accelerated Decarbonization of Cement via Integrated CO2 Capture and Mineralization to Produce High Strength Construction Materials (ACCEL-CCM)

The U.S. Department of Energy (DOE) is proposing to provide federal funding to Cornell University for the development of an integrated carbon dioxi…

January 9, 2024

CX-270707: Kesselring Site Building 28 Motor Drive Replacement Project

The KS Building (Bldg.) 28 Motor Drive Replacement (Bldg. 28 MDR) project will replace the existing main propulsion drive located in Bldg. 28 with a new power supply consisting of four new inverters and a new transformer rectifier.