February 3, 2024

CX-029750: Gering-McGrew and Bayard Tap-Bayard Distribution Line Vegetation Management (Hand Work; VM4 24-008)

Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Gering-McGrew (G…

November 6, 2023

CX-029147: Julesburg-Julesburg Tap 115-kV Transmission Line Structure Replacement

Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 25, 33, 40, 41, 42, 43, 59, 60, 62, …

November 6, 2023

CX-029145: Big Springs-Ogallala 115-kV Transmission Line Structure Replacements

Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Ault-Craig (AU-C…

November 6, 2023

CX-029144: Sidney (TS)-Big Springs 115-kV Transmission Line Structure Replacements

Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road and transmission line right-of-way (…

August 10, 2023

CX-028823: FY22 Scale-Up of Integrated Biorefineries and Greenhouse Gas Reduction in First Generation Ethanol Production (Scale-Up )

The U.S. Department of Energy (DOE) is proposing to provide funding to Green Plains Inc. (Green Plains

July 7, 2023

CX-028481: Box Butte Switching Station-Chadron 115-kV Transmission Line Access Road Maintenance and Landing Construction

Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to build landings to facilitate future structure replacements and c…

March 2, 2023

CX-027623: Resource Assessment for CO2 Storage via Accelerated Carbonation Reactionw/ Recycled Concrete Aggregates (RCA) 

This project plans to explore the option of permanently storing CO2 as mineral carbonates and silica by reacting with CA(OH)2 and C-S-H in the resi…

June 13, 2022

CX-026346: Vegetation Management (Hand Work) Activities

The Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducts vegetation management activities within existing transmission a…

May 31, 2022

CX-026132: Rebuild of Fort Randall to O'Neill 115kV at the Niobrara River Crossing

WAPA is proposing to rebuild the damaged structures in a location closer to the bridge and highway.…

February 25, 2022

CX-270652: Tenaska Power Services Co. Docket EA-431-A

Tidal U.S. proposes to use existing authorized international electric transmission facilities that are appropriate for open access by third parties.