CX-029725: Hood River Electric Co-Op Interconnection
CX-029724: Shelton-Fairmount Urgent Fiber Replacement
CX-029723: ODFW East Region Salmonid Life Cycle Monitoring
CX-029722: FY24 Benton-White Bluffs Expedited Priority Pole Traditional Method Replacements
Bonneville Power Administration (BPA) proposes to rebuild its Hood River Co-Op Service No. 1 transmission line from Hood River Substation to struct…
Bonneville Power Administration (BPA) is proposing to replace a section of failed fiber optic cable along the Shelton-Fairmount No. 1 transmission …
Bonneville Power Administration (BPA) proposes to fund the Oregon Department of Fish and Wildlife (ODFW) to annually monitor Chinook salmon (Oncorh…
Bonneville Power Administration (BPA) is proposing to replace deteriorating wood pole structures and associated hardware and guy wires at specific …