Categorical Exclusion Determinations: Bonneville Power Administration

Categorical Exclusion Determinations issued by Bonneville Power Administration.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • April 29, 2014

    Keeler and Troutdale Substations Communication Equipment Additions
    CX(s) Applied: B1.7
    Date: 12/30/2013
    Location(s): Oregon, Oregon
    Offices(s): Bonneville Power Administration

  • April 28, 2014

    2014 Alvey District Wood Pole Replacement Projects
    CX(s) Applied: B1.3
    Date: 04/28/2014
    Location(s): Oregon, Oregon, Oregon
    Offices(s): Bonneville Power Administration

  • April 28, 2014

    2014 Chemawa District Wood Pole Replacement Projects
    CX(s) Applied: B1.3
    Date: 04/28/2014
    Location(s): Oregon, Oregon, Oregon, Oregon, Oregon
    Offices(s): Bonneville Power Administration

  • April 25, 2014

    John Day Powerhouse-John Day Number 1-4 Conductor Replacements
    CX(s) Applied: B1.3
    Date: 04/25/2014
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • April 24, 2014

    Raver-Covington Conductor Replacement
    CX(s) Applied: B1.3
    Date: 04/24/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • April 24, 2014

    Meter Installation at Fossil Lake Solar Project
    CX(s) Applied: B1.7
    Date: 04/24/2014
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • April 22, 2014

    Hatwai Substation Bay 4 Equipment Acquisition
    CX(s) Applied: B1.24
    Date: 04/22/2014
    Location(s): Idaho
    Offices(s): Bonneville Power Administration

  • April 21, 2014

    Burial of Overhead Fiber Optic Cable at Grand Coulee Radio Station
    CX(s) Applied: B4.7
    Date: 04/21/2014
    Location(s): Washington, Washington
    Offices(s): Bonneville Power Administration

  • April 21, 2014

    Cowlitz Falls Fish Facility and Fish Transfer Facility Property Transfers
    CX(s) Applied: B1.24
    Date: 04/21/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • April 14, 2014

    Tacoma-Raver Access Road Easement Exchange
    CX(s) Applied: B1.24
    Date: 04/14/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • April 11, 2014

    Line Tap Construction on the East Ellensburg Tap to Columbia-Ellensburg Transmission Line
    CX(s) Applied: B4.6
    Date: 04/11/2014
    Location(s): Washington, Washington
    Offices(s): Bonneville Power Administration

  • April 10, 2014

    Hat Rock Tap Switching Station Equipment Transfer
    CX(s) Applied: B1.24
    Date: 04/10/2014
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • April 7, 2014

    Marion-Alvey Marion-Lane Insulator Replacement Project
    CX(s) Applied: B1.3
    Date: 04/07/2014
    Location(s): Oregon, Oregon
    Offices(s): Bonneville Power Administration

  • April 3, 2014

    Chehalis-Mayfield Number 1 Line Impairment Structure Replacements
    CX(s) Applied: B1.3
    Date: 04/03/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • April 2, 2014

    B3S4-White Bluffs Number 1 and Benton-B3S4 Number 1 Transmission Line Reroute
    CX(s) Applied: B4.13
    Date: 04/02/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • April 2, 2014

    Cowlitz Falls Fish Facility Access Agreement Extension
    CX(s) Applied: A2
    Date: 04/02/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • April 1, 2014

    Port Townsend Paper Corporation Power Sales Agreement Amendment
    CX(s) Applied: B4.1
    Date: 04/01/2014
    Location(s): Oregon, Washington
    Offices(s): Bonneville Power Administration

  • March 17, 2014

    Telephone Line Removal Along the Access Road into Wautoma Substation
    CX(s) Applied: B1.3
    Date: 03/17/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • February 6, 2014

    Malin Substation Storm Drain and Switchyard Rock Improvements
    CX(s) Applied: B1.3
    Date: 02/06/2014
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • January 29, 2014

    McNary Substation Equipment Acquisition
    CX(s) Applied: B1.24
    Date: 01/29/2014
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • January 29, 2014

    Wood Pole Replacements Along the Targhee Tap and Targhee-Drummond 115-kilovolt (kV) Transmission Line Rights-Of-Way
    CX(s) Applied: B1.3
    Date: 01/29/2014
    Location(s): Idaho
    Offices(s): Bonneville Power Administration

  • January 27, 2014

    Fiber Installation at Snohomish, SnoKing and Murray Substations
    CX(s) Applied: B4.7
    Date: 01/27/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • January 22, 2014

    St. Clair Loop in to Olympia-South Tacoma No.1 230-kilovolt (kV) Transmission Line
    CX(s) Applied: B4.11
    Date: 01/22/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • January 22, 2014

    Ellensburg-Moxee No. 1 Right-Of-Way (ROW) Geotechnical Exploration Between Structures 17/1-22/2
    CX(s) Applied: B4.7
    Date: 01/22/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • January 17, 2014

    Franklin to Hatwai Fiber Project
    CX(s) Applied: B4.7
    Date: 01/17/2014
    Location(s): Washington, Washington, Washington, Idaho
    Offices(s): Bonneville Power Administration