You are here

Categorical Exclusion Determinations: B5.20

Existing Regulations

B5.20: Biomass power plants
The installation, modification, operation, and removal of small-scale biomass power plants (generally less than 10 megawatts), using commercially available technology (1) intended primarily to support operations in single facilities (such as a school and community center) or contiguous facilities (such as an office complex); (2) that would not affect the air quality attainment status of the area and would not have the potential to cause a significant increase in the quantity or rate of air emissions and would not have the potential to cause significant impacts to water resources; and (3) would be located within a previously disturbed or developed area. Covered actions would be in accordance with applicable requirements (such as local land use and zoning requirements) in the proposed project area and would incorporate appropriate control technologies and best management practices.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • April 17, 2014

    Wood Pellet Boiler Implementation Grant
    CX(s) Applied: B5.1, B5.20
    Date: 04/17/2014
    Location(s): Wisconsin, Wisconsin, Wisconsin
    Offices(s): Golden Field Office

  • April 9, 2014

    State Energy Program - Program Year 2014 - Formula Award - Administrative and Legal Requirement Doc (ALRD)
    CX(s) Applied: A9, A11, B1.2, B1.24, B5.1, B5.14, B5.16, B5.17, B5.18, B5.19, B5.20, B5.22
    Date: 04/09/2014
    Location(s): CX: none
    Offices(s): Golden Field Office

  • February 7, 2014

    Energy Efficiency and Conservation Block Grant Program - Maine Retrofit Ramp-Up
    CX(s) Applied: B5.20
    Date: 02/07/2014
    Location(s): Maine
    Offices(s): Golden Field Office

  • June 14, 2013

    State Energy Program- Wooster Renewable Energy, LLC
    CX(s) Applied: B5.20
    Date: 06/14/2013
    Location(s): Ohio
    Offices(s): Golden Field Office

  • June 14, 2013

    State Energy Program- Northwest Bioenergy, LLC
    CX(s) Applied: B5.20
    Date: 06/14/2013
    Location(s): Ohio
    Offices(s): Golden Field Office

  • June 14, 2013

    State Energy Program- Lime Lakes Energy, LLC
    CX(s) Applied: B5.20
    Date: 06/14/2013
    Location(s): Ohio
    Offices(s): Golden Field Office

  • January 31, 2013

    UC Davis Renewable Energy Anaerobic Digester Facility
    CX(s) Applied: B5.20
    Date: 01/31/2013
    Location(s): California
    Offices(s): Golden Field Office

  • November 28, 2012

    Central Vermont Recovered Biomass Facility
    CX(s) Applied: B5.20
    Date: 11/28/2012
    Location(s): Vermont
    Offices(s): Golden Field Office

  • September 7, 2012

    New Hampshire-County-Grafton
    CX(s) Applied: A9, A11, B2.5, B3.6, B5.1, B5.20
    Date: 09/07/2012
    Location(s): New Hampshire
    Offices(s): Energy Efficiency and Renewable Energy

  • May 31, 2012

    University of Wisconsin Oshkosh Anaerobic Dry Digestion Facility
    CX(s) Applied: A9, B3.6, B5.20
    Date: 05/31/2012
    Location(s): Wisconsin
    Offices(s): Golden Field Office

  • November 16, 2011

    CATEGORICAL EXCLUSION (CX) FOR FINANCIAL INCENTIVE PROGRAMS (CX-EECBG-003)
    CX(s) Applied: B5.1, B5.16, B5.17, B5.18, B5.20
    Date: 11/16/2011
    Location(s): Nationwide
    Office(s): Energy Efficiency & Renewable Energy (EERE) / Oak Ridge Office (ORO)

  • November 16, 2011

    Renewable Energy Technologies on Government Buildings
    CX(s) Applied: B5.1, B5.16, B5.17, B5.18, B5.20
    Date: 11/16/2011
    Location(s): Nationwide
    Offices(s): Energy Efficiency and Renewable Energy