Categorical Exclusion Determinations: B4.12

Existing Regulations

B4.12: Construction of powerlines
Construction of electric powerlines approximately 10 miles in length or less, or approximately 20 miles in length or less within previously disturbed or developed powerline or pipeline rights-of-way.

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • September 8, 2014

    Truckee Carson Irrigation District Hydro Project
    CX(s) Applied: B1.13, B4.12, B5.24
    Date: 12/13/2011
    Location(s): Nevada
    Offices(s): Golden Field Office
    Technology Office: Fuel Cell Technologies
    Award Number: DE-EE000084

  • August 7, 2014

    SLH-100 demonstration project at Monroe Drop
    Award Number: DE-EE0005420
    CX(s) Applied: A9, B4.12, B5.15
    Date: 8/7/2014
    Location(s): Oregon
    Office(s): Golden Field Office

  • February 28, 2014

    Wray-Wray Tap 115-Kilovolt Transmission Line Construction
    CX(s) Applied: B4.12
    Date: 02/28/2014
    Location(s): Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • February 10, 2014

    33 MVA Electrical Power Substation Project - TJSO-SC-14-01
    CX(s) Applied: B4.11, B4.12, B1.13
    Date: 02/10/2014
    Location(s): Virginia
    Offices(s): Thomas Jefferson Site Office

  • September 12, 2013

    Easement to Tennessee Valley Authority for Bethel Valley Substation and Transmission Line Feeds and Clearing of Trees within the Project Area at the Oak Ridge National Laboratory
    CX(s) Applied: B1.24, B4.11, B4.12
    Date: 09/12/2013
    Location(s): Tennessee
    Offices(s): Oak Ridge Office

  • July 25, 2013

    Peninsula Light Company Line and Load Interconnection Request L0308 (Amendment)
    CX(s) Applied: B4.12
    Date: 07/25/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • June 28, 2013

    Pinnacle Peak- Rogers 230-kilovolt Double Inset Structure Number 5/1 a installation
    CX(s) Applied: B4.12
    Date: 06/28/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • June 4, 2013

    Recovery Act: Rural Electric Cooperative Geothermal Development
    CX(s) Applied: B4.12, B5.15
    Date: 06/04/2013
    Location(s): Oregon
    Offices(s): Golden Field Office

  • December 13, 2012

    Sologen Geothermal Co-Production Field Demonstration
    CX(s) Applied: A9, B1.31, B3.1, B4.12, B5.5, B5.12, B5.15
    Date: 12/13/2012
    Location(s): Texas
    Offices(s): Golden Field Office

  • October 2, 2012

    300 Area Electrical Service Project
    CX(s) Applied: B4.12
    Date: 10/02/2012
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • June 8, 2012

    Buried Power Line at Customer Operations Center
    CX(s) Applied: B1.3, B4.6, B4.12
    Date: 06/08/2012
    Location(s): Wyoming
    Offices(s): RMOTC

  • June 8, 2012

    Buried Power Line at Customer Operations Center
    CX(s) Applied: B1.3, B4.6, B4.12
    Date: 06/08/2012
    Location(s): Wyoming
    Offices(s): RMOTC

  • May 17, 2012

    Buried Power Line to 64-SX-3
    CX(s) Applied: B1.3, B4.6, B4.12
    Date: 05/17/2012
    Location(s): Wyoming
    Offices(s): RMOTC

  • October 7, 2011

    Columbia Rural Electric Association (Columbia REA) Dayton Substation Tap Line Project
    CX(s) Applied: B4.12
    Date: 10/07/2011
    Location(s): Dayton, Columbia County, Washington
    Office(s): Bonneville Power Administration

  • May 24, 2011

    Red Bluff Pumping Plant 6-kilovolt Interconnection Project
    CX(s) Applied: B4.12
    Date: 05/24/2011
    Location(s): Tehama County, California
    Office(s): Western Area Power Administration-Sierra Nevada Region

  • April 8, 2011

    Grandview, Arkansas Interconnection
    CX(s) Applied: B4.12
    Date: 04/08/2011
    Location(s): Arkansas
    Offices(s): Southwestern Power Administration

  • March 11, 2011

    Ohop Underbuild Project
    CX(s) Applied: B4.6, B4.12
    Date: 03/11/2011
    Location(s): Pierce County, Washington
    Office(s): Bonneville Power Administration

  • February 4, 2011

    B-TP-10 Buried Electrical Lines
    CX(s) Applied: B1.3, B4.6, B4.7, B4.12
    Date: 02/04/2011
    Location(s): Casper, Wyoming
    Office(s): RMOTC

  • December 23, 2010

    New Power Line for New Generator at Ten Sleep
    CX(s) Applied: B1.3, B4.6, B4.10, B4.12, B5.1
    Date: 12/23/2010
    Location(s): Casper, Wyoming
    Office(s): RMOTC

  • September 3, 2010

    Oklahoma - Tribe - Cherokee Nation, Oklahoma
    CX(s) Applied: A1, A9, A11, B1.15, B2.5, B4.12, B5.1
    Date: 09/03/2010
    Location(s): Oklahoma
    Office(s): Energy Efficiency and Renewable Energy

  • August 23, 2010

    Hadley Street Trail
    CX(s) Applied: B1.10, B4.12
    Date: 08/23/2010
    Location(s): Haltom, Texas
    Office(s): Energy Efficiency and Renewable Energy

  • July 9, 2010

    Geothermal Technologies Program
    CX(s) Applied: B4.12
    Date: 07/09/2010
    Location(s): Casper, Wyoming
    Office(s): RMOTC

  • December 10, 2009

    Native Village of Chitina Renewable Energy Technology - Solar Array for Community Hall
    CX(s) Applied: B3.6, B5.1, B4.12
    Date: 12/10/2009
    Location(s): Chitina, Alaska
    Office(s): Energy Efficiency and Renewable Energy

  • November 20, 2009

    Rewire Electrical to Pole at 77SHX10
    CX(s) Applied: B1.3, B4.12
    Date: 11/20/2009
    Location(s): Casper, Wyoming
    Office(s): RMOTC