Categorical Exclusion Determinations: B3.10

Existing Regulations

B3.10: Particle accelerators
Siting, construction, modification, operation, and decommissioning of particle accelerators, including electron beam accelerators, with primary beam energy less than approximately 100 million electron volts (MeV) and average beam power less than approximately 250 kilowatts (kW), and associated beamlines, storage rings, colliders, and detectors, for research and medical purposes (such as proton therapy), and isotope production, within or contiguous to a previously disturbed or developed area (where active utilities and currently used roads are readily accessible), or internal modification of any accelerator facility regardless of energy, that does not increase primary beam energy or current. In cases where the beam energy exceeds 100 MeV, the average beam power must be less than 250 kW, so as not to exceed an average current of 2.5 milliamperes (mA).

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • December 12, 2013

    Operation of the 50 MeV Electron Linac Accelerator (CSE60)
    CX(s) Applied: B3.10
    Date: 12/12/2013
    Location(s): Illinois
    Offices(s): Argonne Site Office

  • August 5, 2013

    Categorical Exclusion Determination for Indoor, Small- and Pilot-Scale Research and Development
    CX(s) Applied: A9, B1.7, B3.6, B3.10, B3.12, B3.15, B5.1, B5.15
    Date: 08/05/2013
    Location(s): California
    Offices(s): Berkeley Site Office

  • July 3, 2013

    Outdoor, Small-and Pilot-Scale Research and Development
    CX(s) Applied: A9, B1.24, B3.4, B3.6, B3.8, B3.10, B3.12, B3.13, B3.15
    Date: 07/03/2013
    Location(s): Tennessee
    Offices(s): Oak Ridge Office

  • December 20, 2012

    Project to "Establish a Muon Gyromagnetic Ratio Measurement (g-2) Experiment within the Muon Campus
    CX(s) Applied: B1.30, B1.31, B3.10
    Date: 12/20/2012
    Location(s): Illinois
    Offices(s): Fermi Site Office

  • November 19, 2012

    Cooperative Research and Development Agreement Activities
    CX(s) Applied: B3.6, B3.10, B3.11
    Date: 11/19/2012
    Location(s): Tennessee, California, California, Virginia
    Offices(s): Oak Ridge Office

  • November 19, 2012

    Analytical Services and Development Support Activities
    CX(s) Applied: B1.15, B3.1, B3.6, B3.10
    Date: 11/19/2012
    Location(s): Tennessee, California, California, Virginia
    Offices(s): Oak Ridge Office

  • June 28, 2012

    U.S. Customs and Border Protection High-Energy Radiography Test Capability
    CX(s) Applied: B3.10, B3.11
    Date: 06/28/2012
    Location(s): Washington
    Offices(s): Pacific Northwest Site Office

  • June 12, 2012

    Fermilab Muon Campus, including Muon to Electron Conversion Experiment and the MC-1 Building
    CX(s) Applied: B1.15, B3.10
    Date: 06/12/2012
    Location(s): Illinois
    Offices(s): Fermi Site Office

  • May 18, 2012

    U.S. Customs and Border Protection Non-Intrusive Inspection Tests
    CX(s) Applied: B3.10, B3.11
    Date: 05/18/2012
    Location(s): Washington
    Offices(s): Pacific Northwest Site Office

  • March 13, 2012

    Proof-of-principle Coherent Electron Cooling (CeC) Experiment
    CX(s) Applied: B3.10
    Date: 03/13/2012
    Location(s): New York
    Offices(s): Brookhaven Site Office

  • November 28, 2011

    Acquisition of a 3 Megavolt Tandem Accelerator for Research and Teaching in Nuclear Science and Engineering - University of Michigan
    CX(s) Applied: B3.10
    Date: 11/28/2011
    Location(s): Michigan
    Offices(s): Nuclear Energy, Idaho Operations Office

  • November 28, 2011

    Advanced Nuclear Technology Development Infrastructure - University of Wisconsin
    CX(s) Applied: B3.6, B3.10
    Date: 11/28/2011
    Location(s): Wisconsin
    Offices(s): Nuclear Energy, Idaho Operations Office

  • November 28, 2011

    Multipurpose Target Chamber for High-Temperature Ion Irradation - University of Tennessee
    CX(s) Applied: B3.10
    Date: 11/28/2011
    Location(s): Tennessee
    Offices(s): Nuclear Energy, Idaho Operations Office

  • August 9, 2011

    Nanocrystalline SiC and Ti3SiC2 alloys for High-Temperature Reactor Materials – Battelle-
    CX(s) Applied: B3.6, B3.10
    Date: 08/09/2011
    Location(s): CX: none
    Offices(s): Nuclear Energy

  • August 9, 2011

    Nanoscale Stable Precipitation-Strengthened Steels for Nuclear Reactor Applications – Los Alamos National Laboratory
    CX(s) Applied: B3.6, B3.10
    Date: 08/09/2011
    Location(s): New Mexico
    Offices(s): Nuclear Energy

  • August 9, 2011

    Nanostructured Fe-Cr Alloys for Advanced Nuclear Energy Applications – North Carolina State University
    CX(s) Applied: B3.6, B3.10
    Date: 08/09/2011
    Location(s): North Carolina
    Offices(s): Nuclear Energy

  • August 9, 2011

    Accelerated Development of Zr-containing New Generation FM Steels for Advanced Nuclear Reactors – Oak Ridge National Laboratory
    CX(s) Applied: B3.6, B3.10
    Date: 08/09/2011
    Location(s): Tennessee
    Offices(s): Nuclear Energy

  • August 9, 2011

    Radiation Tolerance and Mechanical Properties of Nanostructured Ceramic/metal Composites – University of Nebraska
    CX(s) Applied: B3.6, B3.10
    Date: 08/09/2011
    Location(s): Nebraska
    Offices(s): Nuclear Energy

  • August 9, 2011

    Radiation-induced Ductility Enhancement in Amorphous Fe and Al2O3+TiO2 Nanostructured Coatings in Fast Neutron and High Temperature Environments of Next Generation Reactors – Brookhaven National Laboratory
    CX(s) Applied: B3.6, B3.10
    Date: 08/09/2011
    Location(s): New York
    Offices(s): Nuclear Energy

  • May 25, 2011

    Dynamic Integrated Compression Experimental Facility: Three-Inch Light Gas Gun & Small Pulser - Operations
    CX(s) Applied: B3.6, B3.10
    Date: 05/25/2011
    Location(s): Albuquerque, New Mexico
    Office(s): NNSA-Headquarters, Sandia Site Office

  • March 8, 2011

    Micro Booster Neutrino Experiment (MicroBooNE) Project
    CX(s) Applied: B1.15, B3.10
    Date: 03/08/2011
    Location(s): Illinois
    Office(s): Science, Fermi Site Office

  • August 24, 2010

    Active Measurements Campaign (AMC) at the Materials and Fuels Complex (MFC) - Zero Power Physics Reactor
    CX(s) Applied: B3.6, B3.10
    Date: 08/24/2010
    Location(s): Idaho
    Office(s): Nuclear Energy, Idaho Operations Office

  • March 13, 2010

    End Station Test Beam
    CX(s) Applied: B3.10
    Date: 03/13/2010
    Location(s): California
    Office(s): Science, Stanford Linear Accelerator Site Office

  • December 16, 2009

    Operation and Maintenance of the Building 211 Linac Accelerator
    CX(s) Applied: B3.10
    Date: 12/16/2009
    Location(s): Illinois
    Office(s): Science, Argonne Site Office

  • December 16, 2009

    Operation and Maintenance of 3-Mega Electron-Volt Van De Graaf Accelerator
    CX(s) Applied: B3.10
    Date: 12/16/2009
    Location(s): Illinois
    Office(s): Science, Argonne Site Office