Categorical Exclusion Determinations: B2.5

Existing Regulations

B2.5: Facility safety and environmental improvements
Safety and environmental improvements of a facility (including, but not limited to, replacement and upgrade of facility components) that do not result in a significant change in the expected useful life, design capacity, or function of the facility and during which operations may be suspended and then resumed. Improvements include, but are not limited to, replacement/upgrade of control valves, in-core monitoring devices, facility air filtration systems, or substation transformers or capacitors; addition of structural bracing to meet earthquake standards and/or sustain high wind loading; and replacement of aboveground or belowground tanks and related piping, provided that there is no evidence of leakage, based on testing in accordance with applicable requirements (such as 40 CFR part 265, “Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities” and 40 CFR part 280, “Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks”). These actions do not include rebuilding or modifying substantial portions of a facility (such as replacing a reactor vessel).

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • February 18, 2015

    Pump Station Improvements (Transcontinental)
    Award Number: DE-EE0006212
    CX(s) Applied: B5.1, B2.5
    State Energy Program
    Date: 02/18/2015
    Location(s): LA
    Office(s): Golden Field Office

  • February 18, 2015

    Pump Station Improvements (Terrytown #2)
    Award Number: DE-EE0006212
    CX(s) Applied: B5.1, B2.5
    State Energy Program
    Date: 02/18/2015
    Location(s): LA
    Office(s): Golden Field Office

  • February 18, 2015

    Pump Station Improvements, Helios
    Award Number: DE-EE0006212
    CX(s) Applied: B5.1, B2.5
    State Energy Program
    Date: 02/18/2015
    Location(s): LA
    Office(s): Golden Field Office

  • October 29, 2014

    NREL South Table Mountain Campus Mass Communication System; NREL Tracking No. 14-019
    Award Number: DE-AC36-08GO28308
    CX(s) Applied: B2.5
    Date: 10/29/2014
    Location(s): CO
    Office(s): Golden Field Office

  • August 14, 2014

    Installation of Elevated Fire Water Storage Tank (geotechnical survey)
    CX(s) Applied: B2.5
    Date: 41865
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 14, 2014

    Installation of Elevated Fire Water Storage Tank (geotechnical survey)
    CX(s) Applied: B2.5
    Date: 41865
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 14, 2014

    Install Elevated Fire Water Storage Tank
    CX(s) Applied: B2.5
    Date: 41862
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 11, 2014

    Install Elevated Fire Water Storage Tank
    CX(s) Applied: B2.5
    Date: 41862
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • June 24, 2014

    PNNL Involving Facility, Safety, and Environmental Improvements in the 300 Area
    CX(s) Applied: B2.5
    Date: 06/24/2014
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • June 9, 2014

    Zero Power Physics Reactor (ZPPR) Documented Safety Analysis (DSA) Implementation Project Tasks
    CX(s) Applied: B2.5
    Date: 06/09/2014
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • May 22, 2014

    Shelley-New Sweden Parking Lot Flood Control
    CX(s) Applied: B2.5
    Date: 05/22/2014
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • May 21, 2014

    Hot Fuels and Examination Facility (HFEF) Documented Safety Analysis (DSA) Implementation Tasks
    CX(s) Applied: B2.5
    Date: 05/21/2014
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • May 21, 2014

    Installation of a High Flux Thermal Neutron Source (HFTNS)
    CX(s) Applied: B2.5
    Date: 05/21/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • May 12, 2014

    Arc Flash Hazard Mitigations - Morgantown
    CX(s) Applied: B1.15, B2.5
    Date: 05/12/2014
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • May 8, 2014

    Remove HEPA Filters From The Old HB-Line Exhaust System
    CX(s) Applied: B2.5
    Date: 05/08/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • May 8, 2014

    Tank 12 Temporary Blower Stack
    CX(s) Applied: B2.5
    Date: 05/08/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • May 1, 2014

    Test Reactor Area (TRA)-640 Fire Sprinkler System Modifications
    CX(s) Applied: B2.5
    Date: 05/01/2014
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • April 14, 2014

    Removal of ignition sources, cable, and conduit in the 292-H Central Exhaust HEPA Room
    CX(s) Applied: B2.5
    Date: 04/14/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • April 14, 2014

    Isolate Old 294-H Sand Filter
    CX(s) Applied: B2.5
    Date: 04/14/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • April 1, 2014

    S8G Prototype Refueling Overhaul
    CX(s) Applied: B1.3, B1.5, B1.7, B1.14, B1.30, B1.31, B2.1, B2.4, B2.5, B6.3
    Date: 04/01/2014
    Location(s): New York
    Offices(s): Naval Nuclear Propulsion Program

  • March 5, 2014

    Ductwork Modifications to Limit a Ground-Level Release
    CX(s) Applied: B2.5
    Date: 03/05/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • March 3, 2014

    Replacement of the 254-13H Safety Significant Standby Diesel Generator
    CX(s) Applied: B2.5
    Date: 03/03/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 26, 2014

    Routine Maintenance Activities
    CX(s) Applied: B1.3, B1.4, B1.5, B1.6, B1.7, B1.8, B1.11, B1.13, B1.15, B1.16, B1.17, B1.21, B1.22, B1.23, B1.27, B1.28, B1.31, B1.32, B2.1, B2.2, B2.3, B2.5
    Date: 01/26/2014
    Location(s): New Jersey
    Offices(s): Princeton Site Office

  • January 15, 2014

    MiniBooNE Berme Repair
    CX(s) Applied: B2.5
    Date: 01/15/2014
    Location(s): Illinois
    Offices(s): Fermi Site Office

  • December 9, 2013

    Fabricate/Install Tank 42 Temporary Purge Ventilation Stack HEPA Filter HTF-TMC-13-033
    CX(s) Applied: B2.5
    Date: 12/09/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office