Safety and environmental improvements of a facility (including, but not limited to, replacement and upgrade of facility components) that do not result in a significant change in the expected useful life, design capacity, or function of the facility and during which operations may be suspended and then resumed. Improvements include, but are not limited to, replacement/upgrade of control valves, in-core monitoring devices, facility air filtration systems, or substation transformers or capacitors; addition of structural bracing to meet earthquake standards and/or sustain high wind loading; and replacement of aboveground or belowground tanks and related piping, provided that there is no evidence of leakage, based on testing in accordance with applicable requirements (such as 40 CFR part 265, “Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities” and 40 CFR part 280, “Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks”). These actions do not include rebuilding or modifying substantial portions of a facility (such as replacing a reactor vessel).

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • March 4, 2016

    Johnson Avenue Solar Project
    Award Number: DE-EE0000256
    CX(s) Applied: B2.5, B5.1, B5.16
    Solar Energy Technologies Office
    Date: 07/10/2014
    Location(s): NJ
    Office(s): Golden Field Office

  • January 28, 2016

    STM S&TF Structural Modifications, NREL Tracking No. 16-004
    Award Number: DE-AC36-08GO28308
    CX(s) Applied: B2.5, DOE/EA-1968
    National Renewable Energy Laboratory (NREL)
    Date: 01/28/16
    Location(s): CO
    Office(s): Golden Field Office

  • July 17, 2015

    Safety and Tritium Applied Research Standby Power Upgrade
    CX(s) Applied: B2.5
    Date: 07/17/2015
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • July 6, 2015

    Naval Reactors Facility (NRF) Storm Sewer West Main Replacement Project
    CX(s) Applied: B2.5
    Date: 07/06/2015
    Location(s): None Provided
    Offices(s): Naval Nuclear Propulsion Program

  • June 5, 2015

    NWTC Bldg. 251 Roof & RTU-1 Replacement Project, NREL Tracking No. 15-007
    Award Number: DE-AC36-08GO28308
    CX(s) Applied: B1.16, B2.5, B1.14, B5.1, DOE/EA 1914
    National Renewable Energy Laboratory (NREL)
    Date: 06/05/15
    Location(s): CO
    Office(s): Golden Field Office

  • May 21, 2015

    HB-Line Vessel Vent System (VVS) Valves; V-780 and V-784
    CX(s) Applied: B2.5
    Date: 05/21/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • May 20, 2015

    Addition of Oil Catch Pans at Crane Control Room Shield Window
    CX(s) Applied: B2.5
    Date: 05/20/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • May 19, 2015

    Removal of Out of Service Equipment and Installation of high-efficiency particulate air Filter in Test Reactor Area 670 Pump Test Room
    CX(s) Applied: B2.5
    Date: 05/19/2015
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • April 27, 2015

    Test Reactor Area-774 Substation Equipment Upgrades
    CX(s) Applied: B2.5
    Date: 04/27/2015
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • April 16, 2015

    Replacement of Test Reactor Area-671 Chemistry Monitoring Unit and Modification of Piping and Components
    CX(s) Applied: B2.5
    Date: 04/16/2015
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • April 14, 2015

    Hot Fuel Examination Facility Lab Hot Water System Modification
    CX(s) Applied: B2.5
    Date: 04/14/2015
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • March 31, 2015

    105-K Failed Tension Rod Disposition
    CX(s) Applied: B2.5
    Date: 03/31/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • March 31, 2015

    Install Automatic Condensate Valve on 108-1K Compressed Air System Receiving Tanks
    CX(s) Applied: B2.5
    Date: 03/31/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • March 31, 2015

    Replacement of Man Hole Covers Test Reactor Area Confined Space-051 and TRA-CX-091
    CX(s) Applied: B2.5
    Date: 03/31/2015
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • March 25, 2015

    Provide a Rated Wall for HB-Line Stairwell #2, Storage Room and Fire Door
    CX(s) Applied: B2.5
    Date: 03/25/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • March 11, 2015

    Idaho Falls (IF)-685 ERV-1 Work Platform
    CX(s) Applied: B2.5
    Date: 03/11/2015
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • March 2, 2015

    Test Reactor Area (TRA)-774 Substation Equipment Upgrades
    CX(s) Applied: B2.5
    Date: 03/02/2015
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • February 18, 2015

    Pump Station Improvements (Transcontinental)
    Award Number: DE-EE0006212
    CX(s) Applied: B5.1, B2.5
    State Energy Program
    Date: 02/18/2015
    Location(s): LA
    Office(s): Golden Field Office

  • February 18, 2015

    Pump Station Improvements (Terrytown #2)
    Award Number: DE-EE0006212
    CX(s) Applied: B5.1, B2.5
    State Energy Program
    Date: 02/18/2015
    Location(s): LA
    Office(s): Golden Field Office

  • February 18, 2015

    Pump Station Improvements, Helios
    Award Number: DE-EE0006212
    CX(s) Applied: B5.1, B2.5
    State Energy Program
    Date: 02/18/2015
    Location(s): LA
    Office(s): Golden Field Office

  • February 6, 2015

    Columbia Generating Station Seismic Bus Connections
    CX(s) Applied: B2.5
    Date: 02/06/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • January 14, 2015

    Replacement of the 254-13H Safety Significant (SS) Standby Diesel Generator
    CX(s) Applied: B2.5
    Date: 01/14/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 6, 2015

    Removal of Flat Bars Around Test Reactor Area (TRA)-671 Cold Well Screens
    CX(s) Applied: B2.5
    Date: 01/06/2015
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • January 5, 2015

    Replacement of the 254-13H Safety Significant (SS) Standby Diesel Generator
    CX(s) Applied: B2.5
    Date: 01/05/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 17, 2014

    Materials and Fuels Complex (MFC)-765 Elevator Upgrade
    CX(s) Applied: B2.5
    Date: 12/17/2014
    Location(s): Idaho
    Offices(s): Nuclear Energy