Categorical Exclusion Determinations: B1.7

Existing Regulations

B1.7: Electronic equipment
Acquisition, installation, operation, modification, and removal of electricity transmission control and monitoring devices for grid demand and response, communication systems, data processing equipment, and similar electronic equipment.

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • April 29, 2014

    Keeler and Troutdale Substations Communication Equipment Additions
    CX(s) Applied: B1.7
    Date: 12/30/2013
    Location(s): Oregon, Oregon
    Offices(s): Bonneville Power Administration

  • April 24, 2014

    Meter Installation at Fossil Lake Solar Project
    CX(s) Applied: B1.7
    Date: 04/24/2014
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • April 1, 2014

    S8G Prototype Refueling Overhaul
    CX(s) Applied: B1.3, B1.5, B1.7, B1.14, B1.30, B1.31, B2.1, B2.4, B2.5, B6.3
    Date: 04/01/2014
    Location(s): New York
    Offices(s): Naval Nuclear Propulsion Program

  • January 27, 2014

    Replace Fiber Optic Receivers/Transmitters, etc. on S&S Systems
    CX(s) Applied: B1.7
    Date: 01/27/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 26, 2014

    Routine Maintenance Activities
    CX(s) Applied: B1.3, B1.4, B1.5, B1.6, B1.7, B1.8, B1.11, B1.13, B1.15, B1.16, B1.17, B1.21, B1.22, B1.23, B1.27, B1.28, B1.31, B1.32, B2.1, B2.2, B2.3, B2.5
    Date: 01/26/2014
    Location(s): New Jersey
    Offices(s): Princeton Site Office

  • December 30, 2013

    Revenue Meter Installation at Wind River Biomass Facility
    CX(s) Applied: B1.7
    Date: 12/30/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • December 10, 2013

    Uninterrupted Power Supply Replacement for Certain Safeguards and Security Systems in K-Area Complex
    CX(s) Applied: B1.7
    Date: 12/10/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 2, 2013

    Uninterrupted Power Supply Replacement for Certain Safeguards and Security Systems in K-Area Complex
    CX(s) Applied: B1.7
    Date: 12/02/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 2, 2013

    Mission Support Alliance Annual Categorical Exclusion for Electronic Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.7 for Calendar Year 2014
    CX(s) Applied: B1.7
    Date: 12/02/2013
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • November 8, 2013

    Protection and Communication Facilities Maintenance
    CX(s) Applied: B1.3, B1.7, B1.19
    Date: 11/08/2013
    Location(s): Arizona, Nevada, California, Utah
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • November 1, 2013

    "Equipment Additions to the Ostrander and Pearl Substations and Dittmer Control Center

    CX(s) Applied: B1.7
    Date: 11/01/2013
    Location(s): Oregon, Washington
    Offices(s): Bonneville Power Administration"

  • October 31, 2013

    246-2H Conduit Routing
    CX(s) Applied: B1.7
    Date: 10/31/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 25, 2013

    Hardeson Small Generator Integration
    CX(s) Applied: B1.7
    Date: 09/25/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • September 24, 2013

    Longview and Tillamook Substation Communication Upgrades
    CX(s) Applied: B1.7
    Date: 09/24/2013
    Location(s): Washington, Oregon
    Offices(s): Bonneville Power Administration

  • September 5, 2013

    McLoughlin Substation Equipment Additions
    CX(s) Applied: B1.7
    Date: 09/05/2013
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • August 16, 2013

    DE-FOA-0000797: Innovation for Increasing Cybersecurity for Energy Delivery Systems (I2CEDS)
    CX(s) Applied: A1, A9, A11, B1.2, B1.7
    Date: 08/16/2013
    Location(s): Multiple States
    Offices(s): National Energy Technology Laboratory

  • August 9, 2013

    Paisley Geothermal Integration
    CX(s) Applied: B1.7
    Date: 08/09/2013
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • August 5, 2013

    Categorical Exclusion Determination for Indoor, Small- and Pilot-Scale Research and Development
    CX(s) Applied: A9, B1.7, B3.6, B3.10, B3.12, B3.15, B5.1, B5.15
    Date: 08/05/2013
    Location(s): California
    Offices(s): Berkeley Site Office

  • July 11, 2013

    Strategic Petroleum Reserve Computer Services, 2015-2020
    CX(s) Applied: B1.7
    Date: 07/11/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • July 3, 2013

    Mariah Wind
    CX(s) Applied: B1.7
    Date: 07/03/2013
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • June 25, 2013

    Harbour Pointe Small Generator Integration
    CX(s) Applied: B1.7
    Date: 06/25/2013
    Location(s): Washington, Washington
    Offices(s): Bonneville Power Administration

  • May 17, 2013

    Substation Maintenance and Renovation Activities
    CX(s) Applied: B1.3, B1.7, B1.11, B1.27, B1.31, B1.33, B2.2, B2.3, B2.5, B4.6
    Date: 05/17/2013
    Location(s): Colorado, Wyoming, Nebraska, Montana, Utah
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • April 15, 2013

    Integration of the Port of Tillamook Bay Generating Facility
    CX(s) Applied: B1.7
    Date: 04/15/2013
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • April 12, 2013

    Electronic Equipment Upgrades and Emergency Generator Replacements
    CX(s) Applied: B1.7
    Date: 04/12/2013
    Location(s): CX: none
    Offices(s): Bonneville Power Administration

  • March 25, 2013

    Revenue Meter Replacement at Franklin County Public Utility District’s (PUD) Taylor Flats Substation
    CX(s) Applied: B1.7
    Date: 03/25/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration