You are here

Categorical Exclusion Determinations: B1.4

Existing Regulations

B1.4: Air conditioning systems for existing equipment
Installation or modification of air conditioning systems required for temperature control for operation of existing equipment.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • June 5, 2015

    NWTC Bldg. 251 Roof & RTU-1 Replacement Project, NREL Tracking No. 15-007
    Award Number: DE-AC36-08GO28308
    CX(s) Applied: B1.16, B2.5, B1.14, B5.1, DOE/EA 1914

    National Renewable Energy Laboratory (NREL)
    Date: 06/05/15
    Location(s): CO
    Office(s): Golden Field Office

  • July 28, 2014

    Building 33 Renovation & Site Fence Line Extension
    CX(s) Applied: B1.4, B1.16, B1.23, B2.1, B2.2, B2.5
    Date: 41848
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • July 25, 2014

    Building 31 Laboratory Renovations
    CX(s) Applied: B1.4, B1.16, B1.23, B2.1, B2.2, B2.5
    Date: 41845
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • July 3, 2014

    Metal Mountain Communications Site - Emergency Air Conditioner Replacement
    CX(s) Applied: B1.4
    Date: 07/03/2014
    Location(s): California
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • June 30, 2014

    Install Single Split System Air Conditioning Unit in Bryan Mound Building No. 281 (BM-OM-1229)
    CX(s) Applied: B1.4
    Date: 06/30/2014
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • June 23, 2014

    B14 Renovation
    CX(s) Applied: B1.4, B1.15, B2.1
    Date: 06/23/2014
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • January 26, 2014

    Routine Maintenance Activities
    CX(s) Applied: B1.3, B1.4, B1.5, B1.6, B1.7, B1.8, B1.11, B1.13, B1.15, B1.16, B1.17, B1.21, B1.22, B1.23, B1.27, B1.28, B1.31, B1.32, B2.1, B2.2, B2.3, B2.5
    Date: 01/26/2014
    Location(s): New Jersey
    Offices(s): Princeton Site Office

  • December 2, 2013

    Mission Support Alliance Annual Categorical Exclusion for Air Conditioning Systems for Existing Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.4 for Calendar Year 2014
    CX(s) Applied: B1.4
    Date: 12/02/2013
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • October 17, 2013

    Construction and Maintenance Activities at Existing Field Offices and Operation Centers
    CX(s) Applied: B1.3, B1.4, B1.11, B1.16, B1.17, B1.27, B1.31, B1.33, B1.34, B2.2, B2.3, B2.5, B4.7, B5.1, B5.16, B5.17, B5.23
    Date: 10/17/2013
    Location(s): CX: none
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • May 5, 2013

    2013 B17 Renovation
    CX(s) Applied: B1.4, B1.15, B1.31, B2.1
    Date: 05/03/2013
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • April 16, 2013

    B-4 Rooms 110, 111, and 112 Roof Top Heating, Ventilation, and Air Conditioning Unit Replacement
    CX(s) Applied: B1.4, B2.1, B2.2, B2.5
    Date: 04/16/2013
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • December 5, 2012

    Mission Support Alliance Annual Categorical Exclusion for Air Conditioning Systems for Existing Equipment under 10 CFR 1021, Subpart o, Appendix B
    CX(s) Applied: B1.4
    Date: 12/05/2012
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • November 19, 2012

    Ventilation Activities
    CX(s) Applied: B1.4, B1.16, B2.1, B2.3
    Date: 11/19/2012
    Location(s): Tennessee, California, California, Virginia
    Offices(s): Oak Ridge Office

  • September 21, 2012

    Routine and Non-Routine Activities at the Grand Junction, Colorado, Office Site
    CX(s) Applied: B1.3, B1.4, B1.7, B1.13, B1.15, B1.16, B1.23, B1.24, B1.28, B2.1, B2.2, B2.4, B2.5, B3.1, B5.16, B6.1
    Date: 09/21/2012
    Location(s): Grand Junction
    Offices(s): Legacy Management

  • August 31, 2012

    B-22A Renovation
    CX(s) Applied: B1.4, B1.7, B1.15, B1.23, B2.1, B2.3, B2.5
    Date: 08/31/2012
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • July 16, 2012

    Routine Maintenance
    CX(s) Applied: B1.3, B1.4, B1.8, B1.16, B1.17
    Date: 07/16/2012
    Location(s): Washington
    Offices(s): Pacific Northwest Site Office

  • July 5, 2012

    Idaho National Laboratory Administration Building (IAB)Telephone Room 112 Heating, Ventilating, and Air Conditioning (HVAC) Upgrade
    CX(s) Applied: B1.4
    Date: 07/05/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • July 2, 2012

    Lovell, Basin, and Buffalo Bill Substations, Control Building Rehabilitation Projects Big Horn and Park Counties, Wyoming
    CX(s) Applied: B1.3, B1.4
    Date: 07/02/2012
    Location(s): Wyoming
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • May 9, 2012

    Information Operations & Research Center (IORC) Room E-6 Air Conditioner Unit Installation
    CX(s) Applied: B1.4
    Date: 05/09/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • April 16, 2012

    West Hackberry Building 301 Air Handling Unit-1 Heating, Ventilation, and Air Conditioning Replacement
    CX(s) Applied: B1.4
    Date: 04/16/2012
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • February 13, 2012

    Water and Sewer Energy Efficiency Grants Market Title
    CX(s) Applied: A1, B1.4, B2.2, B5.1, B5.2
    Date: 02/13/2012
    Location(s): South Carolina
    Offices(s): National Energy Technology Laboratory

  • February 3, 2012

    Weld Substation Control Building Heating, Ventilation and Air Conditioning Replacement
    CX(s) Applied: B1.4
    Date: 02/03/2012
    Location(s): Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • February 1, 2012

    Bayou Choctaw Building 401 Air Handling Unit-3 Heating, Ventilation and Air Conditioning Replacement
    CX(s) Applied: B1.4
    Date: 02/01/2012
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • December 23, 2011

    Energy Efficiency Program for Municipalities, Schools, Hospitals, Public Colleges and Universities
    CX(s) Applied: A1, A9, A11, B1.4, B2.2, B5.1
    Date: 12/23/2011
    Location(s): New York
    Offices(s): National Energy Technology Laboratory

  • December 14, 2011

    Energy Efficiency through the State Energy Office
    CX(s) Applied: A1, B1.4, B5.1
    Date: 12/14/2011
    Location(s): New Jersey
    Offices(s): National Energy Technology Laboratory