Removal of asbestos-containing materials from buildings in accordance with applicable requirements (such as 40 CFR part 61, “National Emission Standards for Hazardous Air Pollutants”; 40 CFR part 763, “Asbestos”; 29 CFR part 1910, subpart I, “Personal Protective Equipment”; and 29 CFR part 1926, “Safety and Health Regulations for Construction”; and appropriate state and local requirements, including certification of removal contractors and technicians).

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • June 3, 2014

    Tucson Substation - Asbestos Abatement
    CX(s) Applied: B1.16
    Date: 06/03/2014
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • February 18, 2014

    Materials Characterization Laboratory & Radiological/Environment, Safety and Health Training Facility Construction Project
    CX(s) Applied: B1.15, B1.16, B1.17, B1.23, B1.33, B3.15
    Date: 02/18/2014
    Location(s): New York
    Offices(s): Naval Nuclear Propulsion Program

  • January 26, 2014

    Routine Maintenance Activities
    CX(s) Applied: B1.3, B1.4, B1.5, B1.6, B1.7, B1.8, B1.11, B1.13, B1.15, B1.16, B1.17, B1.21, B1.22, B1.23, B1.27, B1.28, B1.31, B1.32, B2.1, B2.2, B2.3, B2.5
    Date: 01/26/2014
    Location(s): New Jersey
    Offices(s): Princeton Site Office

  • December 2, 2013

    Mission Support Alliance Annual Categorical Exclusion for Asbestos Removal under 10 CFR 1021, Subpart D, Appendix B, B1.16 for Calendar Year 2014
    CX(s) Applied: B1.16
    Date: 12/02/2013
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • October 24, 2013

    Replace Potable Water Supply Line: Phase Two (Project Modification)
    CX(s) Applied: B1.3, B1.16, B1.32
    Date: 10/24/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • October 17, 2013

    Construction and Maintenance Activities at Existing Field Offices and Operation Centers
    CX(s) Applied: B1.3, B1.4, B1.11, B1.16, B1.17, B1.27, B1.31, B1.33, B1.34, B2.2, B2.3, B2.5, B4.7, B5.1, B5.16, B5.17, B5.23
    Date: 10/17/2013
    Location(s): CX: none
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • September 17, 2013

    Building 30 (B-30) Demolition
    CX(s) Applied: B1.16, B1.23
    Date: 09/17/2013
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • September 16, 2013

    Replace Potable Water Supply Lines: Phase Two
    CX(s) Applied: B1.3, B1.16, B1.32, B2.2
    Date: 09/16/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • September 13, 2013

    Heating, Ventilation, and Air Conditioning Upgrades of the Field Test Laboratory Building and the Solar Energy Research Facility at the National Renewable Energy Laboratory South Table Mountain Campus
    CX(s) Applied: B1.16
    Date: 09/13/2013
    Location(s): Colorado
    Offices(s): Golden Field Office

  • June 5, 2013

    Development Concept of Operations Improvement Project
    CX(s) Applied: B1.3, B1.16
    Date: 06/05/2013
    Location(s): Tennessee
    Offices(s): Y-12 Site Office

  • April 10, 2013

    B903 Renovation
    CX(s) Applied: B1.16, B1.29, B2.1, B2.5
    Date: 04/10/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • January 9, 2013

    C-CA-CAM Building Complex Demolition and Site Restoration
    CX(s) Applied: B1.11, B1.16, B1.17, B1.23, B1.24, B1.27, B1.30, B1.33, B1.34
    Date: 01/09/2013
    Location(s): Pennsylvania
    Offices(s): Naval Nuclear Propulsion Program

  • December 14, 2012

    Washington River Protection Solutions LLC - Asbestos Removal
    CX(s) Applied: B1.16
    Date: 12/14/2012
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • December 5, 2012

    Mission Support Alliance Annual Categorical Exclusion for Asbestos Removal under 10 CFR 1021, Subpart D, Appendix B
    CX(s) Applied: B1.16
    Date: 12/05/2012
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • November 19, 2012

    Asbestos Abatement Actions
    CX(s) Applied: B1.16
    Date: 11/19/2012
    Location(s): Tennessee, California, California, Virginia
    Offices(s): Oak Ridge Office

  • November 19, 2012

    Ventilation Activities
    CX(s) Applied: B1.4, B1.16, B2.1, B2.3
    Date: 11/19/2012
    Location(s): Tennessee, California, California, Virginia
    Offices(s): Oak Ridge Office

  • November 19, 2012

    Asbestos Abatement Actions
    CX(s) Applied: B1.16
    Date: 11/19/2012
    Location(s): Tennessee, California, Virginia
    Offices(s): Berkeley Site Office

  • September 21, 2012

    Routine and Non-Routine Activities at the Grand Junction, Colorado, Office Site
    CX(s) Applied: B1.3, B1.4, B1.7, B1.13, B1.15, B1.16, B1.23, B1.24, B1.28, B2.1, B2.2, B2.4, B2.5, B3.1, B5.16, B6.1
    Date: 09/21/2012
    Location(s): Grand Junction
    Offices(s): Legacy Management

  • August 3, 2012

    CH2MHill Plateau Remediation Company - Asbestos Removal Actions
    CX(s) Applied: B1.16
    Date: 08/03/2012
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • July 16, 2012

    Routine Maintenance
    CX(s) Applied: B1.3, B1.4, B1.8, B1.16, B1.17
    Date: 07/16/2012
    Location(s): Washington
    Offices(s): Pacific Northwest Site Office

  • July 16, 2012

    Building 1 Renovation
    CX(s) Applied: B1.15, B1.16, B2.1, B2.2, B2.5
    Date: 07/16/2012
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • June 8, 2012

    Renovations and Maintenance Activities for Buildings, Structures, Infrastructures and Equipment
    CX(s) Applied: B1.3, 61.4, 61.5, B1.11, B1.15, B1.16, B1.17, 81.22, B1.27, 62.1, B2.2, B2.3, 62.5
    Date: 06/08/2012
    Location(s): Illinois
    Offices(s): New Brunswick Laboratory

  • April 20, 2012

    Prototype Staff Building 114
    CX(s) Applied: B1.15, B1.16, B1.23
    Date: 04/20/2012
    Location(s): New York
    Offices(s): Naval Nuclear Propulsion Program

  • April 20, 2012

    Security Upgrades Major Construction Project
    CX(s) Applied: B1.11, B1.15, B1.16, B1.23, B2.2
    Date: 04/20/2012
    Location(s): New York
    Offices(s): Naval Nuclear Propulsion Program

  • April 19, 2012

    L-Building Demolition and Site Restoration
    CX(s) Applied: B1.16, B1.17, B1.23
    Date: 04/19/2020
    Location(s): Pennsylvania