Categorical Exclusion (CX) Determinations By Date

  • January 22, 2014

    Midwest Regional Carbon Sequestration Partnership Phase III - Subtask 1.7
    CX(s) Applied: B3.1, B3.7
    Date: 01/22/2014
    Location(s): Ohio
    Offices(s): National Energy Technology Laboratory

  • January 22, 2014

    St. Clair Loop in to Olympia-South Tacoma No.1 230-kilovolt (kV) Transmission Line
    CX(s) Applied: B4.11
    Date: 01/22/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • January 22, 2014

    Ellensburg-Moxee No. 1 Right-Of-Way (ROW) Geotechnical Exploration Between Structures 17/1-22/2
    CX(s) Applied: B4.7
    Date: 01/22/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • January 22, 2014

    Enhanced Shielding Performance of High Level Waste Storage Packages via Multi-Component Coatings – Virginia Polytechnic Institute and State University
    CX(s) Applied: B3.6
    Date: 01/22/2014
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • January 22, 2014

    NuScale SMR Design Development and Certification Project
    CX(s) Applied: B3.6
    Date: 01/22/2014
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • January 21, 2014

    Big George-Heart Mountain 69 Kilovolt Transmission Line Glendale Tap Replacement, Park County, Wyoming
    CX(s) Applied: B4.6
    Date: 01/21/2014
    Location(s): Wyoming
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • January 21, 2014

    Collider Detector at Fermilab Repurposing
    CX(s) Applied: B1.15, B2.1
    Date: 01/21/2014
    Location(s): Illinois
    Offices(s): Fermi Site Office

  • January 21, 2014

    Beaver Creek-Sterling 115 Kilovolt Transmission Line Structure Relocation, Morgan County, Colorado
    CX(s) Applied: B4.13
    Date: 01/21/2014
    Location(s): Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • January 21, 2014

    Blythe-Knob 161 Kilovolt Transmission Line, Structure Maintenance Project
    CX(s) Applied: B1.3
    Date: 01/21/2014
    Location(s): California, California
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • January 21, 2014

    Accelerating the Deployment of Energy Efficiency and Renewable Energy Technologies in South Africa
    CX(s) Applied: A9, A11
    Date: 01/21/2014
    Location(s): CX: none
    Offices(s): Golden Field Office

  • January 17, 2014

    Franklin to Hatwai Fiber Project
    CX(s) Applied: B4.7
    Date: 01/17/2014
    Location(s): Washington, Washington, Washington, Idaho
    Offices(s): Bonneville Power Administration

  • January 16, 2014

    Haverhill Citizens Center Energy Efficiency Improvements
    CX(s) Applied: B1.23, B5.1
    Date: 01/16/2014
    Location(s): Massachusetts
    Offices(s): National Energy Technology Laboratory

  • January 15, 2014

    Ross Communication Tower Fiber Installation
    CX(s) Applied: B4.7
    Date: 01/15/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • January 15, 2014

    Lightspeed Network's Fiber Installation near Pilot Butte Substation
    CX(s) Applied: B4.7
    Date: 01/15/2014
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • January 15, 2014

    Field Testing of the Electromagnetic/Resistivity and Magnetic System in U.S.
    CX(s) Applied: A9, B3.1
    Date: 01/15/2014
    Location(s): Nevada, Nevada, Nevada
    Offices(s): National Energy Technology Laboratory

  • January 15, 2014

    Reaction Chemistry and Engineering Facility
    CX(s) Applied: B3.6
    Date: 01/15/2014
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • January 15, 2014

    Laser Nanoparticle Lab
    CX(s) Applied: B3.6
    Date: 01/15/2014
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • January 15, 2014

    The Pacific Marine Energy South Energy Test Site (PMEC-SETS)
    CX(s) Applied: A9
    Date: 01/15/2014
    Location(s): Oregon
    Offices(s): Golden Field Office

  • January 15, 2014

    Optimal Power Buoy Structure Design for Maximized Power to Weight Ratio and Reduced Installed Capital Cost
    CX(s) Applied: A9, B3.6
    Date: 01/15/2014
    Location(s): New Jersey, New Jersey
    Offices(s): Golden Field Office

  • January 15, 2014

    MiniBooNE Berme Repair
    CX(s) Applied: B2.5
    Date: 01/15/2014
    Location(s): Illinois
    Offices(s): Fermi Site Office

  • January 14, 2014

    Self-Consolidating Concrete Construction for Modular Units – Georgia Institute of Technology
    CX(s) Applied: B3.6
    Date: 01/14/2014
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • January 13, 2014

    100 Area Fire Station Domestic Well House and Piping Modifications (905-126G)
    CX(s) Applied: B1.3
    Date: 01/13/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 13, 2014

    Cable Trenching in the Gila Substation
    CX(s) Applied: B4.6
    Date: 01/13/2014
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • January 10, 2014

    Strategic Petroleum Reserve Leased Workover Rig and Workover Services, 2014-2018
    CX(s) Applied: B5.12
    Date: 01/10/2014
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 10, 2014

    Bayou Choctaw Cavern 20 Decommissioning (Long Term Actions)
    CX(s) Applied: B1.28
    Date: 01/10/2014
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office