You are here

Categorical Exclusion (CX) Determinations By Date

  • January 15, 2014

    Optimal Power Buoy Structure Design for Maximized Power to Weight Ratio and Reduced Installed Capital Cost
    CX(s) Applied: A9, B3.6
    Date: 01/15/2014
    Location(s): New Jersey, New Jersey
    Offices(s): Golden Field Office

  • January 15, 2014

    MiniBooNE Berme Repair
    CX(s) Applied: B2.5
    Date: 01/15/2014
    Location(s): Illinois
    Offices(s): Fermi Site Office

  • January 14, 2014

    Self-Consolidating Concrete Construction for Modular Units – Georgia Institute of Technology
    CX(s) Applied: B3.6
    Date: 01/14/2014
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • January 13, 2014

    100 Area Fire Station Domestic Well House and Piping Modifications (905-126G)
    CX(s) Applied: B1.3
    Date: 01/13/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 13, 2014

    Cable Trenching in the Gila Substation
    CX(s) Applied: B4.6
    Date: 01/13/2014
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • January 10, 2014

    Strategic Petroleum Reserve Leased Workover Rig and Workover Services, 2014-2018
    CX(s) Applied: B5.12
    Date: 01/10/2014
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 10, 2014

    Bayou Choctaw Cavern 20 Decommissioning (Long Term Actions)
    CX(s) Applied: B1.28
    Date: 01/10/2014
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 9, 2014

    Commercialization of an Atmospheric Iron-Based Coal Direct
    CX(s) Applied: A9, B3.6
    Date: 01/09/2014
    Location(s): Ohio
    Offices(s): National Energy Technology Laboratory

  • January 9, 2014

    Light Willow Demonstration
    CX(s) Applied: B3.6
    Date: 01/09/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 9, 2014

    Electrical District 2 to Saguaro #2 115 Kilovolt Transmission Line, Marker Ball Installation at Structure 26-10.
    CX(s) Applied: B1.3
    Date: 01/09/2014
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • January 8, 2014

    North Central Texas Alternative Fuel and Advanced Technology Investments
    CX(s) Applied: B5.23
    Date: 01/08/2014
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • January 8, 2014

    Midwest Region Alternative Fuels Project
    CX(s) Applied: A1
    Date: 01/08/2014
    Location(s): Missouri
    Offices(s): National Energy Technology Laboratory

  • January 8, 2014

    Solar, Install, Mount, Production, Labor, Equipment (SIMPLE BoS)
    CX(s) Applied: A9, B3.6, B5.16
    Date: 01/08/2014
    Location(s): Georgia
    Offices(s): Golden Field Office

  • January 6, 2014

    Dynamic Mechanical Analyzer
    CX(s) Applied: B3.6
    Date: 01/06/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 6, 2014

    Longview-Cowlitz Fiber Optic Cable Upgrade
    CX(s) Applied: B4.7
    Date: 01/06/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • January 6, 2014

    Miller Number Abrasivity Tester
    CX(s) Applied: B3.6
    Date: 01/06/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 6, 2014

    Blue River-Gore Pass 230 Kilovolt Transmission Line Danger Tree Management in Grand County, Colorado
    CX(s) Applied: B1.3
    Date: 01/06/2014
    Location(s): Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • January 6, 2014

    Subcontractor Repair of Roof Leaks at 704-23G
    CX(s) Applied: B1.3
    Date: 01/06/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 6, 2014

    Characterization and Analyses of Core Samples from the 105-C Disassembly Basin
    CX(s) Applied: B3.6
    Date: 01/06/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 6, 2014

    Plume Generator at Butylnitrate
    CX(s) Applied: B3.6
    Date: 01/06/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 6, 2014

    Cooling Tower Water Sampling and Analysis for Legionella pneumophila Density
    CX(s) Applied: B3.1
    Date: 01/06/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 6, 2014

    Glass Microsphere Encapsulation of Hydrogen Absorbents
    CX(s) Applied: B3.6
    Date: 01/06/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 2, 2014

    Menominee Tribal Enterprises District Biomass Combined Heat and Power Project
    CX(s) Applied: A9, B5.14
    Date: 01/02/2014
    Location(s): Wisconsin
    Offices(s): Golden Field Office

  • January 2, 2014

    Novel Geothermal Development of Deep Sedimentary Systems in the United States
    CX(s) Applied: A9, B3.6
    Date: 01/02/2014
    Location(s): Utah
    Offices(s): Golden Field Office

  • January 2, 2014

    Tonto Apache Community Clean Energy Project
    CX(s) Applied: A9, B5.1, B5.16
    Date: 01/02/2014
    Location(s): Arizona
    Offices(s): Golden Field Office