Categorical Exclusion (CX) Determinations By Date

  • April 30, 2014

    Energy Systems Laboratory Process Demonstration Unit Biomass Dryer Exhaust Stack Exhaustion
    CX(s) Applied: B1.31
    Date: 04/30/2014
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • April 29, 2014

    Connectivity Between Fractures and Pores in Hydrocarbon-Rich Mudrocks
    CX(s) Applied: A9, B3.6
    Date: 04/29/2014
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • April 29, 2014

    Vapor Space Corrosion Testing of Carbon Steel
    CX(s) Applied: B3.6
    Date: 04/29/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • April 29, 2014

    Subcontractor Repair of Roof Leaks at 717-16K
    CX(s) Applied: B1.3
    Date: 04/29/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • April 29, 2014

    Install One Power Pole and Three Anchors Northwest of 704-1N
    CX(s) Applied: B1.3
    Date: 04/29/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • April 29, 2014

    Archer Substation Microwave Building Fiber Optic Installation
    CX(s) Applied: B4.7
    Date: 04/29/2014
    Location(s): Wyoming
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • April 29, 2014

    OCGen Module Mooring Project
    CX(s) Applied: B5.25
    Date: 04/29/2014
    Location(s): Maine
    Offices(s): Golden Field Office

  • April 29, 2014

    Keeler and Troutdale Substations Communication Equipment Additions
    CX(s) Applied: B1.7
    Date: 12/30/2013
    Location(s): Oregon, Oregon
    Offices(s): Bonneville Power Administration

  • April 28, 2014

    Recovery Act: Slipstream Testing of a Membrane Carbon Dioxide Capture Process for Existing Coal-Fired Power Plants
    CX(s) Applied: A1, A9, B3.6
    Date: 04/28/2014
    Location(s): CX: none
    Offices(s): National Energy Technology Laboratory

  • April 28, 2014

    Reducing the Impacts of Deterioration of Well Cement Technology
    CX(s) Applied: B3.6
    Date: 04/28/2014
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • April 28, 2014

    2014 Alvey District Wood Pole Replacement Projects
    CX(s) Applied: B1.3
    Date: 04/28/2014
    Location(s): Oregon, Oregon, Oregon
    Offices(s): Bonneville Power Administration

  • April 28, 2014

    2014 Chemawa District Wood Pole Replacement Projects
    CX(s) Applied: B1.3
    Date: 04/28/2014
    Location(s): Oregon, Oregon, Oregon, Oregon, Oregon
    Offices(s): Bonneville Power Administration

  • April 28, 2014

    Non-Newtonian Multiphase Laboratory
    CX(s) Applied: B3.6
    Date: 04/28/2014
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • April 28, 2014

    Mixed Waste Management Facility Cap Drainage Repairs
    CX(s) Applied: B6.1
    Date: 04/28/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • April 28, 2014

    A Portable, Two-Stage, Antifouling Hollow Fiber Membrane Nanofiltration Process
    CX(s) Applied: A9, A11, B3.6
    Date: 04/28/2014
    Location(s): New Mexico
    Offices(s): National Energy Technology Laboratory

  • April 28, 2014

    A Portable, Two-Stage, Antifouling Hollow Fiber Membrane Nanofiltration Process
    CX(s) Applied: A9, A11, B3.6
    Date: 04/28/2014
    Location(s): New Mexico
    Offices(s): National Energy Technology Laboratory

  • April 28, 2014

    High Pressure Immersion and Reactive Transport Laboratory
    CX(s) Applied: B3.6
    Date: 04/28/2014
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • April 28, 2014

    Oxy-Fired Pressurized Fluidized Bed Combustion - Phase II
    CX(s) Applied: A1, A9, B3.6
    Date: 04/28/2014
    Location(s): CX: none
    Offices(s): National Energy Technology Laboratory

  • April 28, 2014

    Recovery Act: Slipstream Testing of a Membrane Carbon Dioxide Capture Process for Existing Coal-Fired Power Plants
    CX(s) Applied: A1, A9, B3.6
    Date: 04/28/2014
    Location(s): California
    Offices(s): National Energy Technology Laboratory

  • April 25, 2014

    Curecanti-Lost Canyon 230-Kilovolt Reconductoring Project
    CX(s) Applied: B1.3
    Date: 04/25/2014
    Location(s): Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • April 25, 2014

    John Day Powerhouse-John Day Number 1-4 Conductor Replacements
    CX(s) Applied: B1.3
    Date: 04/25/2014
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • April 25, 2014

    Lusk Rural Communications Building Removal
    CX(s) Applied: B1.22, B1.23, B1.24
    Date: 04/25/2014
    Location(s): Wyoming
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • April 25, 2014

    Notice of Preliminary Determination of Energy Savings for ANSI/ASHRAE/IES Standard 90.1-2013
    CX(s) Applied: A6
    Date: 04/25/2014
    Location(s): CX: none
    Offices(s): Golden Field Office

  • April 24, 2014

    Rework West Hackberry 36” Crude Oil Pipeline Mainline Valves
    CX(s) Applied: B1.3
    Date: 12/10/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • April 24, 2014

    Pantex Lake Land Utilization
    CX(s) Applied: B1.11
    Date: 11/05/2013
    Location(s): Texas
    Offices(s): Pantex Site Office