You are here

Categorical Exclusion (CX) Determinations By Date

  • September 11, 2014

    Henderson-Mead Number 2 230-Kilovolt Transmission Line, Erosion Repair at Structure 2/4
    CX(s) Applied: B1.3
    Date: 09/11/2013
    Location(s): Nevada, Nevada
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • June 4, 2014

    Cheniere Marketing, LLC
    CX(s) Applied: B5.7
    Date: 06/04/2014
    Location(s): Nationwide
    Offices(s): Fossil Energy

  • May 30, 2014

    Carib Energy (USA) LLC
    CX(s) Applied: B5.7
    Date: 05/30/2014
    Location(s): Nationwide
    Offices(s): Fossil Energy

  • May 1, 2014

    Big George-Heart Mountain 69-Kilovolt Transmission Line Glendale Tap Replacement (Amended)
    CX(s) Applied: B4.13
    Date: 05/01/2014
    Location(s): Wyoming
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • April 29, 2014

    Connectivity Between Fractures and Pores in Hydrocarbon-Rich Mudrocks
    CX(s) Applied: A9, B3.6
    Date: 04/29/2014
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • April 29, 2014

    Archer Substation Microwave Building Fiber Optic Installation
    CX(s) Applied: B4.7
    Date: 04/29/2014
    Location(s): Wyoming
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • April 29, 2014

    Keeler and Troutdale Substations Communication Equipment Additions
    CX(s) Applied: B1.7
    Date: 12/30/2013
    Location(s): Oregon, Oregon
    Offices(s): Bonneville Power Administration

  • April 28, 2014

    Recovery Act: Slipstream Testing of a Membrane Carbon Dioxide Capture Process for Existing Coal-Fired Power Plants
    CX(s) Applied: A1, A9, B3.6
    Date: 04/28/2014
    Location(s): CX: none
    Offices(s): National Energy Technology Laboratory

  • April 28, 2014

    Reducing the Impacts of Deterioration of Well Cement Technology
    CX(s) Applied: B3.6
    Date: 04/28/2014
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • April 28, 2014

    2014 Alvey District Wood Pole Replacement Projects
    CX(s) Applied: B1.3
    Date: 04/28/2014
    Location(s): Oregon, Oregon, Oregon
    Offices(s): Bonneville Power Administration

  • April 28, 2014

    2014 Chemawa District Wood Pole Replacement Projects
    CX(s) Applied: B1.3
    Date: 04/28/2014
    Location(s): Oregon, Oregon, Oregon, Oregon, Oregon
    Offices(s): Bonneville Power Administration

  • April 28, 2014

    Non-Newtonian Multiphase Laboratory
    CX(s) Applied: B3.6
    Date: 04/28/2014
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • April 28, 2014

    A Portable, Two-Stage, Antifouling Hollow Fiber Membrane Nanofiltration Process
    CX(s) Applied: A9, A11, B3.6
    Date: 04/28/2014
    Location(s): New Mexico
    Offices(s): National Energy Technology Laboratory

  • April 28, 2014

    A Portable, Two-Stage, Antifouling Hollow Fiber Membrane Nanofiltration Process
    CX(s) Applied: A9, A11, B3.6
    Date: 04/28/2014
    Location(s): New Mexico
    Offices(s): National Energy Technology Laboratory

  • April 28, 2014

    High Pressure Immersion and Reactive Transport Laboratory
    CX(s) Applied: B3.6
    Date: 04/28/2014
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • April 28, 2014

    Oxy-Fired Pressurized Fluidized Bed Combustion - Phase II
    CX(s) Applied: A1, A9, B3.6
    Date: 04/28/2014
    Location(s): CX: none
    Offices(s): National Energy Technology Laboratory

  • April 28, 2014

    Recovery Act: Slipstream Testing of a Membrane Carbon Dioxide Capture Process for Existing Coal-Fired Power Plants
    CX(s) Applied: A1, A9, B3.6
    Date: 04/28/2014
    Location(s): California
    Offices(s): National Energy Technology Laboratory

  • April 25, 2014

    Curecanti-Lost Canyon 230-Kilovolt Reconductoring Project
    CX(s) Applied: B1.3
    Date: 04/25/2014
    Location(s): Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • April 25, 2014

    John Day Powerhouse-John Day Number 1-4 Conductor Replacements
    CX(s) Applied: B1.3
    Date: 04/25/2014
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • April 25, 2014

    Lusk Rural Communications Building Removal
    CX(s) Applied: B1.22, B1.23, B1.24
    Date: 04/25/2014
    Location(s): Wyoming
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • April 24, 2014

    Rework West Hackberry 36” Crude Oil Pipeline Mainline Valves
    CX(s) Applied: B1.3
    Date: 12/10/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • April 24, 2014

    Pantex Lake Land Utilization
    CX(s) Applied: B1.11
    Date: 11/05/2013
    Location(s): Texas
    Offices(s): Pantex Site Office

  • April 24, 2014

    Raver-Covington Conductor Replacement
    CX(s) Applied: B1.3
    Date: 04/24/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • April 24, 2014

    Meter Installation at Fossil Lake Solar Project
    CX(s) Applied: B1.7
    Date: 04/24/2014
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • April 24, 2014

    Enhanced Wind Resource Assessment with Sonic Ranging and Detection at Tooele Army Depot
    CX(s) Applied: A9, B3.1
    Date: 04/24/2014
    Location(s): Utah
    Offices(s): Golden Field Office