You are here

OPS 9.8 Control of Equipment and System Status 8/24/98

The objective of this surveillance is to verify that the contractor has established and implemented an effective program to control equipment and system status.  The surveillance activities provide a basis for verifying the effectiveness of the contractor's program as well as compliance with DOE requirements.